My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_2004_0315
Roseville
>
City Council
>
City Council Meeting Minutes
>
200x
>
2004
>
CC_Minutes_2004_0315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2008 2:02:17 PM
Creation date
7/13/2005 4:38:33 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
3/15/2004
Meeting Type
Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Study Session - 03/15/04 <br />Minutes -Page 9 <br />• Authorize staff to proceed with necessary fieldwork to <br />assemble feasibility drawings, alignment and costs for <br />Council action approval <br />• Explore burial of electric distribution lines <br />City Attorney Squires and staff were directed by Mayor <br />Klausing, with Council majority consensus to review past <br />Council meeting minutes and information to determine the <br />existence, the status and conditions of the "moratorium" on <br />pathway construction previously considered by the City Council. <br />Councilmember Schroeder addressed the moratorium that he <br />believed had been enacted during the 2004 budget discussions. <br />City Attorney Squires noted that his office could review past <br />action of Council; the status of any moratorium on pathway <br />construction; and options for Council to change their previous <br />action. City Attorney Squires recommended that following his <br />review of that information, he inform staff directly on whether <br />they should proceed as directed. <br />Public Works Director Schwartz sought clarification regarding <br />the Council's direction; with the majority of Councilmembers <br />concurring that staff be directed to proceed as requested. <br />Councilmember Schroeder requested that the proposed directive <br />to staff for proceeding with a feasibility study on the proposed <br />County Road B-2 Regional Trail project be recorded in motion <br />form. <br />Maschka moved, Ihlan seconded, authorizing staff to hold public <br />information meetings, proceed with necessary field work to <br />assemble feasibility drawings, alignment and costs for Council <br />action consideration; and to explore the burial of electric <br />distribution lines; pending recommendation of the City Attorney <br />related to the moratorium. <br />Roll Call <br />Ayes: Ihlan, Maschlca and Klausing. <br />Nays: Schroeder. <br />
The URL can be used to link to this page
Your browser does not support the video tag.