My WebLink
|
Help
|
About
|
Sign Out
Home
2012_0312_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2012
>
2012_0312_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2012 3:27:33 PM
Creation date
3/8/2012 4:03:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Rebecca S. Nestingen, PE <br />Water Resource Engineer <br />General Background <br />Education <br />Rebecca is experienced in hydrology, hydraulics, and water/waste <br />treatment. Her masters work focused on assessing the infiltration <br />Master of Science <br />Civil Engineering <br />characteristics of rain gardens in various settings. Rebecca was <br />University of Minnesota (2007) <br />contributor to the Minnesota BMP assessment manual. <br />Bachelor of Science <br />Environmental Engineering <br />Experience <br />University of Wisconsin-Platteville <br />(2005) <br />Surface Water Management Plans for: <br /> <br />Worthington, Minn. <br />Professional Registration <br />Long Lake, Minn. <br />Professional Engineer in <br />Minnesota <br />Maplewood, Minn. <br /> <br />Vadnais Heights, Minn. <br /> <br /> <br /> Developed <br />Storm Water Master Plan Area B1 Study Worthington, Minn. <br />a hydrological and hydraulic model using XP-SWMM to evaluate <br />MnDOTs concept drainage plan for Area B1 in Worthingtons SWMP. <br />Compared MnDOTs concept plan to the Citys SWMP concept and <br />suggested alternatives for drainage outlets taking into consider <br />potential development of the study area. <br />Preliminary and <br />Gladstone Phase 1 Improvements Maplewood, Minn. <br />final hydrologic and hydraulic design of bioretention basins to <br />stormwater from area street improvements. Preparation of plans, <br />and specifications for construction. <br /> <br />Baker Park Campground Rain Gardens Three Rivers Park District. <br />Design of three large rain gardens and channel stabilization mea <br />order to reduce flow rates, pollutant loading, and gully erosion <br />Preparation of plans, SWPPP, and specifications for construction <br />Completed detailed <br />Welcome Park XP-SWMM Model Crystal, Minn. <br />hydrologic and hydraulic analysis of an existing storm sewer sys <br />State Aid reconstruction project using XP-SWMM. Collected as-builts and <br />other data necessary for the analysis including land use area summaries <br />using GIS. Provided a technical report to the City that discusse <br />the analysis. <br />Sweeney Lake TMDL Study Bassett Creek Watershed Management <br />Rebecca is currently working on the TMDL for <br />Organization, Minn. <br />Sweeney Lake which involves analyzing in-lake water quality data and the <br />lake water quality response to nutrient load scenarios using BAT <br />model. <br />| page 31 <br />firm background and qualifications <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.