Laserfiche WebLink
<br />City of Roseville 2006 Fee Schedule <br /> <br />Investigation Fee: Work without a Permit <br />Whenever any work for which a permit is required from the city has been commenced without <br />first obtaining said permit, a special investigation shall be made before a permit may be issued for <br />such work. An investigation fee, in addition to the permit fee, shall be collected whether or not a <br />permit is then or subsequently issued. The investigation fee shall be equal to the amount of the <br />permit fee required by this code. The payment of such investigation fee shall not exempt any <br />person from compliance with all other provisions of this code nor from any penalty prescribed by <br />law. <br /> <br />Manufactured Home Permit Fee: <br />New installation <br /> <br />$170.00 <br /> <br />Mechanical Permit Fee: <br />Residential <br />Air conditioning - new <br />Air conditioning - replacement <br />Warm air furnace - new <br />Warm air furnace - replacement <br />Hot water boilers - new <br />Hot water boilers - replacement <br />Unit heaters <br />Swimming pool heaters <br />Miscellaneous work & gas piping <br />Minimum fee <br />Gas fireplace <br /> <br />$38.50 <br />$38.50 <br />$82.50 <br />$44.00 <br />$82.50 <br />$44.00 <br />$44.00 <br />$44.00 <br />1.25 % of estimated job cost <br />$38.50 <br />$44.00 <br /> <br />Commercial <br />All commercial work <br /> <br />1.25 % of estimated job cost <br /> <br />Moving Permit Fee: <br />Over private property only <br />Over public streets <br />Investigation fee <br /> <br />$75.00 <br />$110.00 <br />$55.38/hour <br /> <br />Plumbing Permit Fee: <br />Administrative/minimum fee <br />Plus, for each fixture opening <br />Miscellaneous work <br />Backflow prevention verification <br /> <br />$38.50 <br />$8.75 <br />1.25 % of estimated job cost <br />$22.00 <br /> <br />Plan Review Fee: <br />When a building permit is required and a plan is required to be submitted, a plan checking fee <br />shall be paid. Plan checking fees for all buildings, except for construction costs in R-1 and R-2 <br />zones which do not involve new single family structures and are of less than fifteen thousand <br />dollars ($15,000.00), shall be sixty five percent (65%) of the building permit fee as set forth in <br />Section 901.06 of this chapter, except as modified in M.S.B.C. Section 1300. (Ord. 1110,4-13- <br />1992) <br /> <br />7 <br />