My WebLink
|
Help
|
About
|
Sign Out
Home
res_10353
Roseville
>
City Council
>
City Council Resolutions
>
10xxx
>
10300
>
res_10353
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:28:37 AM
Creation date
12/5/2005 2:02:56 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Meeting Date
11/28/2005
Meeting Type
Regular
Resolution #
10353
Resolution Title
ESTABLISHING THE 2006 FEE SCHEDULE
Resolution Date Passed
11/28/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of Roseville 2006 Fee Schedule <br /> <br />Demolition Permit Fee: <br />Tenant improvement/remodeling prior to building permit <br />Structures not connected to utilities <br />Residential structures connected to city utilities <br />Commercial structures cOlmected to city utilities <br /> <br />$55.00 <br />$55.00 <br />$110.00 <br />$250.00 <br /> <br />Electrical Permit Fee: <br />Set through yearly contract with Contract Electrical Inspector <br /> <br />Fire Safety Inspection Fee: <br />An amount equal to eight percent (8%) of the amount determined by the Building Permit Fee <br />(except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections (Ord. 1237,3-13-2000, eff. 5-1-2000) <br /> <br />Grading/Excavation Permit Fee: <br /> <br />Grading Plan Review Fee <br /> <br />50 cubic yards or less. .. . .. . .. . .. . . . .. . .. . . .. . .. . .. .. . . . . .. .. .. .. . . . . .. .. .. . . . . . . .. . . .. .. . .. ...N 0 fee <br />51 to 100,000 cubic yards - $52.75 for the first 10,000 cubic yards, plus $26.25 for each <br />additional 10,000 yards or fraction thereof. <br />100,001 to 200,000 cubic yards - $288.95 for the first 100,000 cubic plus $14.20 for each <br />additional 10,000 cubic yards or fraction thereof. <br />200,001 cubic yards or more - $430.89 for the first 200,000 cubic yards, plus $7.77 for <br />each additional 10,000 cubic yards or fraction thereof. <br />Other Fees: <br />Additional plan review required by changes, additions or revisions to approved plans <br />(minimum charge - one-half hour). ................................... ...............$55.38 per hour <br /> <br />Grading Permit Fee <br /> <br />1 to 1,000 cubic yards - $50.00 for the first 100 cubic yards, plus $17.00 for each <br />additional 100 cubic yards or fraction thereof. <br />1,001 to 10,000 cubic yards - $208.34 for the first 1,000 cubic yards, plus $15.54 for <br />each additional 1,000 cubic yards or fraction thereof. <br />10,001 to 100,000 cubic yards - $384.14 for the first 10,000 cubic yards, plus $70.70 for <br />each additional 10,000 cubic yards or fraction thereof. <br />100,001 cubic yards or more - $984.42 for the first 100,000 cubic yards, plus $39.10 for <br />each additional 10,000 cubic yards or fraction thereof. <br />Other Inspections and Fees <br />1. Inspections outside of normal business hours.. .. . .. . .. .. . .. .. .. .. .. . .. .. .. $55.38 per hour <br />(minimum charge - one-half hour) <br />2. Reinspection fees.............................................................. .$55.38 per hour <br />3. Inspections for which no fee is specifically indicated... ... . .. ... . .. ... .. . $5 5.38 per hour <br />(minimum charge - one-half hour) <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.