My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_2003_0915
Roseville
>
City Council
>
City Council Meeting Minutes
>
200x
>
2003
>
CC_Minutes_2003_0915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:36:27 AM
Creation date
4/17/2006 10:24:08 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
9/15/2003
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Regular City Council Minutes - 9/15/03 <br />Page 2 <br /> <br />not require the item to be removed from the Consent Agenda. <br /> <br />City Manager Beets also advised that a clarification of the <br />monopole agreement, Consent Agenda Item XI., L, entitled, <br />"Approving a Lease Agreement with Sprint PCS to Occupy <br />Space on the Civic Center Campus Monopole," should state <br />that the Sprint antenna would be located at eighty feet (80'), <br />rather than the stated sixty-five feet (65'). City Manager Beets <br />clarified for Mayor Kysylyczyn that the pole height would be <br />built at one hundred feet (100'), with the ability to add an <br />additional fifty feet (50') if and when warranted. <br /> <br />There were no public or Council comments on the remainder of <br />the Consent Agenda items; nor in the Land Use items listed. <br /> <br />III. Presentations <br /> <br />A. Update on County's Dale Street Improvement Project <br />Ramsey County Traffic Engineer Dan Soler was present to <br />update the City Council and citizens on work being <br />performed by Ramsey County on Dale Street, specifically <br />traffic signal and geometric improvement options <br />available at the intersection of Dale Street and County <br />Road B. <br /> <br />Mr. Soler reviewed three (3) options for lane <br />configurations and the advantages and disadvantages of <br />each option. <br />1) Four (4) lane configuration, leaving a single phase <br />signal as existing; <br />2) Leaving the Lane configuration as it currently <br />exists; splitting the signal phases for separate <br />north/south arrows (similar to that at the intersection <br />of County Road C and Rice Street); <br />3) Four (4) lane road striped to move everyone to the <br />right lane, introducing a left turn lane and arrow, <br />with protected left turn phasing (similar to that at <br />the intersection of County Road C and Hamline <br />Avenue). <br /> <br />Mr. Soler discussed the various safety and delay issues <br /> <br />Presentations <br /> <br />Update on <br />County's Dale <br />Street <br />Improvement <br />Proj ect <br />
The URL can be used to link to this page
Your browser does not support the video tag.