My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_2006_0417
Roseville
>
City Council
>
City Council Meeting Minutes
>
200x
>
2006
>
CC_Minutes_2006_0417
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:37:18 AM
Creation date
5/15/2006 12:28:54 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
4/17/2006
Meeting Type
Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City Council Study Session - 04/17/06 <br />Minutes - Page 8 <br /> <br />Roselawn Avenue <br />Councilmember Kough introduced Ms. Francy Reitz to <br />address her concerns regarding safety along Fairview <br />Avenue between County Road Band Roselawn Avenue. <br /> <br />Francy Reitz, 2009 Aldine Street <br />Ms. Reitz summarized her concerns regarding pedestrian <br />safety with cars passing on the shoulder and requested that <br />the City Council put this pathway segment higher on their <br />priority list and pursue grant monies or reserve budget <br />monies to do so in the immediate future. <br /> <br />Councilmember Kough concurred with Ms. Reitz' concerns <br />and the need to make this segment a higher priority. <br /> <br />Councilmember Ihlan concurred, opining that the request <br />was valid, and further opined that there \x/ere other gaps in <br />the City's pathway system, specifically on Fairview further <br />north of County Road C-2 that had similar problems, and <br />that other residents had expressed concerns regarding <br />safety issues. <br /> <br />Discussion included projected costs; pnonty levels; <br />previous Council rejection of funding for pathway <br />construction; the Vista 2000 community visioning process <br />and adoption of a Pathway System Master Plan in 1997; the <br />2002 ranking summary for pathway construction; <br />maintenance issues for existing pathways; community <br />opposition to some pathway segments; federal fund <br />availability for construction; construction of segments as <br />part of infrastructure reconstruction projects; Ramsey <br />County ownership of roadways; and reinstatement over the <br />last few years of a portion of the pathways budget. <br /> <br />Councilmember Ihlan opined that the pathway funding <br />should be phased back in as a basic infrastructure need and <br />that grant funding and collaboration with Ramsey Council <br />should ensue to fill the gaps in the current system. <br /> <br />City Manager Beets noted that the "Active Living Ramsey <br />County" group was currently considering additional <br /> <br />Discuss a Possible <br />New Pathway on <br />Fairview between <br />County Road Band <br />Roselawn Avenue <br />
The URL can be used to link to this page
Your browser does not support the video tag.