My WebLink
|
Help
|
About
|
Sign Out
Home
2012-04-24_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2012
>
2012-04-24_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2012 4:16:22 PM
Creation date
4/19/2012 4:08:09 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/24/2012
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jy <br />Update <br />The City's Contractor, Valley Paving, will start work <br />in your neighborhood on Monday, April 23. The <br />watermain replacement on Eldridge Ave is the first <br />task that they will complete. The construction work <br />will begin with removal of the curb along Eldridge <br />Ave between Pascal St and Hemline Ave. <br />Following curb removals, the contractor will start <br />grinding up the pavement on the north half of this <br />road. A temporary water main will be set up next <br />week to provide water service during construction. <br />Watermain construction will begin the week of April <br />30. <br />On Burke Ave and the Pascal St segment north of <br />Burke Ave, curb removals are scheduled to follow <br />the removal work on Eldridge Ave. <br />Work on Belmont Ln and Skillman Ave is not <br />scheduled to begin until mid May. <br />The work is anticipated to be complete in June. A <br />full schedule is available on the project webpage. <br />This schedule is weather dependent. If we get rain, <br />there will be delays. <br />The Contractor will maintain access during <br />construction. If you have special access needs, <br />please let us know. <br />Safety <br />Your assistance in keeping the work zone safe is <br />important. The noise and dust created by <br />construction traffic make it difficult for workers to <br />watch onlookers. Heavy equipment operators must <br />concentrate on the job at hand and may not notice <br />children playing near or behind equipment. <br />Please remind children to stay clear of the <br />construction area and equipment both during <br />working and non - working hours. <br />Sanitary Sewer Lining <br />The Sanitary Sewer lining project will begin in your <br />neighborhood next week as well. They will provide <br />you notice at least 24 hours in advance of them <br />performing work on the sewer that you are <br />connected to. <br />2012 Pavement <br />Management Project <br />�j <br />g. 7- <br />i <br />Private Systems/ Gardens <br />Curbs designated for removal will be marked this <br />week. Underground sprinklers, electrical for yard <br />lights, perennial gardens, or invisible fences <br />installed within 10 or 15 feet of the curb, need to be <br />removed. Removal and reinstallation of these <br />items is the responsibility of the property owner. <br />We recommend that you mark with paint or flags <br />the location of underground wires or sprinklers <br />immediately. If you are not sure if your system is in <br />the way, please call Dean Findell. These items <br />should be removed from the city right- of- way <br />before 7:00am Monday, April 23. <br />If these items are not removed, the contractor will <br />damage them during construction. The City will not <br />pay to repair or replace these systems or gardens. <br />Private work- Sanitary Sewer Services & <br />Driveways <br />As of April 20, we are no longer accepting requests <br />for private sanitary sewer or driveway work. <br />The City will be sending out sanitary sewer <br />estimates this week. <br />We will provide the Contractor the list of driveway <br />requests and they will provide you quotes. We <br />recommend that you contact other driveway <br />contractors for comparison quotes. <br />Check for construction updates at: www.citvofroseville.com /2012PMP <br />
The URL can be used to link to this page
Your browser does not support the video tag.