Laserfiche WebLink
Utility Flags <br />To protect against underground utility damage, the <br />Contractor will be calling in utility locates. This is <br />required by anyone digging a hole whether it is for <br />planting a tree or removing curb. Xcel Energy, <br />Comcast and CenturyLink will locate their <br />underground utilities by spray painting and placing <br />flags in the boulevard. <br />School Bus stops: The City is coordinating this <br />project with the Roseville school district. The <br />Contractor will be made aware of bus stops and will <br />be required to minimize disruptions. <br />Mail Delivery <br />In the areas where the curb is being removed and <br />placed, your mailbox will need to be moved for the <br />duration of the project. The Contractor is working <br />on installing temporary mailboxes for the property <br />owners affected. Property owners at 1152, 1160, <br />1221, 1231, and 1241 will have their mailboxes <br />relocated to a central location for delivery. You will <br />be notified by the post office of this change. <br />Survey Markers <br />In order to perform the project construction, <br />Engineers place a series of survey markers for the <br />Contractor to measure from. Typically these <br />markers are offset several feet from the object or <br />point they refer to so that they are not disturbed <br />during the construction process. As a result, these <br />offset markers are often placed well into the <br />resident's yard. <br />Safety <br />Residents should use caution while driving through <br />the construction zone and be alert for moving <br />equipment, holes, trenches and other hazards. <br />Your assistance in keeping the work zone safe is <br />important. The noise and dust created by <br />construction traffic make it difficult for workers to <br />watch onlookers. Heavy equipment operators must <br />concentrate on the job at hand and may not notice <br />children playing near or behind equipment. <br />Please remind children to stay clear of the <br />construction area and equipment both during <br />working and non - working hours. <br />Project Contacts: <br />I Dean Findell, Project Coordinator <br />(651) 792 -7046 <br />dean.findell(a�ci. roseville. mn. us <br />Deb Bloom, City Engineer <br />(651) 792 -7042 <br />deb.bloom(a)ci.roseville.mn.us <br />Contact Us! <br />If you have any questions, concerns, or <br />comments please contact us at 651- 792 -7003 <br />between 8 am and 4:30 pm. <br />Throughout the project, we will keep you informed <br />through monthly direct mailings and weekly <br />I updates on the project website. <br />If you would prefer to receive an electronic copy <br />of these newsletters instead of paper, please let <br />us know. <br />Notify Me list <br />To receive notifications of website updates and <br />other project related news, sign up for the County <br />i Road C -2 Project "Notify Me" List at: <br />http://www.ci.roseville.mn.us/list.aspx <br />Signing up for this list does not automatically <br />remove you from our newsletter mailing list. <br />After Hours <br />If an issue arises outside of regular business <br />hours, contact the City's 24 -hour non - emergency <br />+ number at 651- 767 -0640. <br />ALWAYS CALL 911 FOR EMERGENCIES. <br />Check for construction updates at: www.citvofroseville.com /CoRdC2 <br />