Laserfiche WebLink
4 <br />7 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />City of Roseville <br />SPECIAL ASSESSMENT POLICY <br />SUMMARY <br />Y- - l laR7aSSfff lRiXffRR'A17�!lRfIRlRTS��.' <br />- !f <br />---- -- <br />-2-1 The following is the assessment volicv for all reconstruction projects in the Citv of <br />Roseville. , ......4 4.««...1.... „lull apply to an ,....k....,.radi ffg ,.fptiblie «8..,1.. a ,. <br />(a) Property zoned R1 and R2 shall be assessed up to <br />a4 4eas425% of the rp oject &et cost for a 7 -ton, 32 -foot wide pavement with <br />concrete curb and gutter and re iredoutiae drainage. <br />(b) All other proyerty zoning shall be assessed up to 50% of the project cost. <br />(-b)LLMunicipal State Aid Roadways: <br />1pa'4 254 of 414A post for 448 pre�@E4. <br />• Property zoned R1 and R2 shall be assessed up to 25% of the cost <br />propei4y ska4l be °°°A°°Aa ,.4 ° ra4p of a 7 -ton, 32 -foot wide pavement with <br />concrete curb and gutter and rou4ine equired drainage, even if the width or <br />strength is greater. <br />• All other property zoning shall be assessed up to 50% of the project costs. <br />(d) Ramsev Countv or Minnesota Department of Transportation Roadways <br />In the event that special assessments result in more funds being due the <br />Citv from special assessments than the total City cost share of the improvements <br />to such Ramsev Countv or MnDOT roadway. special assessments for such <br />properties shall be reduced proportionately until the total special assessments <br />equal the total Citv costs of the improvement. <br />(e) All property accessing a private driveway at an intersection signal system shall be <br />assessed 100% of the proportionate share of the signal system cost. <br />(fl Project costs include actual construction cost, consultant expenses, engineering, <br />administration, and right of wav acquisition. <br />(e) Assessments shall be on a front foot basis. 14 4 posts s 4 f@ 44 iff'°` <br />t4.-,.ugk (b) a4w ,. all ...., p@14y ffl . be assessed ,. ..,.44:,.4.,.4,. „l.,.. p ,... ,, footage <br />2. The following formulas shall apply for calculating the assessment rate. <br />(a) All corner and multiple frontage R1 and R2 parcels shall be considered as having <br />10% of the second side as being assessable footage unless such parcels could be <br />split or subdivided. <br />(4(b) All corner and multiple frontage for other property zoning shall4 o4 � <br />mill be calculated at 10% for the first 150 feet and then 100% for any <br />additional footage. <br />(,&) c) For all zoning, 9x -odd and irregularly shaped lots, which have rear widths that <br />vary by more than 25% in comparison with the front width, the lot will be <br />assumed to have a depth equal to one -half the sum of the two sides and said depth <br />will be divided into the area of the lot to determine the assessable frontage. <br />(d) All lots of more than four sides will be geometrically converted to a four -sided lot <br />of equal area, then the odd -lot formula as stated in (e) will be used to determine <br />