My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_2006_0828
Roseville
>
City Council
>
City Council Meeting Minutes
>
200x
>
2006
>
CC_Minutes_2006_0828
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:40:38 AM
Creation date
9/12/2006 8:22:02 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
8/28/2006
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City Council Regular Meeting - 08/28/06 <br />Minutes - Page 23 <br /> <br />that additional time was needed for a democratic process before <br />selecting a new City Manager, and more review at the next City <br />Council Study Session on the salary issue and an applicable <br />range in the job description. <br />Roll Call <br />Ayes: Pust; Maschka; and Klausing. <br />Nays: Ihlan and Kough. <br /> <br />10. <br /> <br />Public Works Department Budget Presentation <br />Public Works Director Duane Schwartz presented the 2007 <br />Budget requests of the Public Works Department, representing a <br />status quo budget, with limited new initiatives and attempting to <br />meet previous city and department goals; and continued <br />cooperation by the department with other jurisdictions to share <br />overhead/support. <br /> <br />Mr. Schwartz reviewed the various sections of the department, <br />their staffing and duty areas, along with specific budget issues <br />related to each. <br /> <br />Sections included: <br />AdministrationlEngineering <br />(including joint power arrangements with the Cities of Arden <br />Hills and Falcon Heights); with the 2007 budget request <br />maintaining the current level of staffing and service already in <br />place. Mr. Schwartz noted that ongoing mandated storm water <br />monitoring compliance would continue to tap staff time and <br />resources, and it was anticipated that the existing fee structure <br />would help to offset some costs, but anticipated future impacts to <br />the department. <br /> <br />Street and Storm Water Division <br />Mr. Schwartz noted the impacts of energy-related issues on this <br />department, represented by a significant increase in fuel and <br />asphalt costs, and was cautiously anticipating that in the long- <br />term costs may stabilize. Mr. Schwartz further noted that <br />streetscape needs continue to increase despite a reduction in FTE <br />(full-time equivalent) staffing in 2005, and continue to stress <br />department staff, summarizing that the department continues to <br />feel the broadening scope of services required, with stagnant <br />staffing, thus draining current service levels. <br /> <br />Public Works <br />Department <br />Budget <br />Presentation <br />
The URL can be used to link to this page
Your browser does not support the video tag.