My WebLink
|
Help
|
About
|
Sign Out
Home
2006 Approved Budget
Roseville
>
Budget
>
2006 Approved Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 1:37:27 PM
Creation date
6/19/2012 1:35:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville — 2006 Budget <br />Division /Program: Storm Drainage <br />Organizational Responsibility: Public Works Director <br />Division / Program Description <br />Storm Drainage division provides for the management of storm water drainage in the City; including <br />flood control, pollution and contamination prevention, street sweeping, and the leaf - pickup program. <br />The Program's activities are accounted for in the Storm Drainage Fund. <br />2006 Goals and Objectives <br />• Sweep all City streets bi- annually focusing on environmentally sensitive areas <br />• Improve and upgrade at least two storm ponding areas per year <br />• Continue catch basin repair and cleaning program <br />• Continue storm sewer inspection an inventory program <br />• Implement Phase II stormwater pollution prevention program as mandated by USEPA <br />Budget Category <br />2003 <br />Actual <br />2004 <br />Actual <br />2005 <br />Budget <br />2006 <br />Budget <br />$Increase <br />(decrease) <br />% Incr. <br />(decr.) <br />Personnel Services <br />$ 173,709 <br />$ 178,985 <br />$ 20200 <br />$2119500 <br />$ 9,500 <br />4.7% <br />Supplies &Materials <br />47,307 <br />31,972 <br />40,950 <br />429300 <br />1,350 <br />3.3 °/ <br />Other Services &Charges <br />674,575 <br />594,405 <br />539,350 <br />5429500 <br />3,150 <br />0.60N <br />Capital Outlay <br />- <br />(3,449) <br />79000 <br />5759000 <br />(215,000) <br />(27.2)% <br />Total <br />$ 895,589 <br />$ 801,913 <br />$ 1,572,300 <br />$1,371,300 <br />$ (201,000)j <br />(12.8) <br />Human Resource Allocation <br />2003 <br />Actual <br />2004 <br />Actual <br />2005 <br />Budget <br />2006 <br />Budget <br />Full-Time Equivalent Positions <br />3.17 <br />3.4 <br />3.4 <br />3.4 <br />2006 Budget Impact Items <br />• Personnel costs include 3.0% COLA on wages, along with planned wage step increases <br />• `Capital Outlay' provides for the scheduled replacement of infrastructure, vehicles and equipment, <br />which can fluctuate from year to year <br />2004/2005 Achievements <br />• Completed two sections of structure inspections and data entry <br />• Resolved several backyard drainage issues <br />• Completed 2nd generation Stormwater Management Plan <br />58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.