My WebLink
|
Help
|
About
|
Sign Out
Home
2006 Approved Budget
Roseville
>
Budget
>
2006 Approved Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 1:37:27 PM
Creation date
6/19/2012 1:35:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville — 2006 Budget <br />Division /Program: Water <br />Organizational Responsibility: Public Works Director <br />Division / Program Description <br />The Water Fund provides city residents with potable water in quantities sufficient to provide fire <br />protection and general public health. The Program's activities are accounted for in the Water Fund. <br />2006 Goals and Objectives <br />• Provide utility customers with safe potable drinking water for a reasonable price <br />• Perform proactive maintenance programs that improve system reliability and reduce operating <br />costs <br />Budget Category <br />2003 <br />Actual <br />2004 <br />Actual <br />2005 <br />Budget <br />2006 <br />Budget <br />$Increase <br />(decrease) <br />% Incr. <br />(decr.) <br />Personnel Services <br />$ 309,844 <br />$ 283,844 <br />$ 306,100 <br />$3169800 <br />$ 10,700 <br />3.5 °/ <br />Supplies &Materials <br />28,415 <br />40,039 <br />31,500 <br />32,450 <br />950 <br />3.00N <br />Other Services &Charges <br />3,767,475 <br />3,592,757 <br />4,152,050 <br />492079850 <br />5500 <br />1.3 °/ <br />Capital Outlay <br />36,933 <br />21,859 <br />25500 <br />346,000 <br />91,000 <br />35.7% <br />Total <br />$ 4,142,707 <br />$ 3,938,499 <br />$ 4,744,650 <br />X4,903,100 <br />$ 158,450 <br />3.3 0 <br />Full -Time Equivalent Positions I 5.15I 5.15I 5.15I 5.15I <br />2006 Budget Impact Items <br />• Personnel costs include 3.0% COLA on wages, along with planned wage step increases <br />• Increase in `Other Services & Charges' reflects the potential rate increase in the purchase of bulk <br />water from the City of St. Paul <br />• `Capital Outlay' provides for the scheduled replacement of infrastructure, vehicles and equipment, <br />which can fluctuate from year to year <br />2004/2005 Achievements <br />• Distributed nearly 2.0 billion gallons of water to Roseville and Arden Hills utility customers <br />• Repaired 27 water main leaks <br />• Flushed, inspected, and maintained 1,750 fire hydrants <br />• Responded to over 4,000 locate requests from Gopher State One Call <br />• Completed all annual major maintenance programs on schedule and within budget <br />• Upgraded Arden Hills Meter Pits to newer technology <br />61VA <br />2003 <br />2004 <br />2005 <br />2006 <br />Human Resource Allocation <br />Actual <br />Actual <br />Budget <br />Budget <br />Full -Time Equivalent Positions I 5.15I 5.15I 5.15I 5.15I <br />2006 Budget Impact Items <br />• Personnel costs include 3.0% COLA on wages, along with planned wage step increases <br />• Increase in `Other Services & Charges' reflects the potential rate increase in the purchase of bulk <br />water from the City of St. Paul <br />• `Capital Outlay' provides for the scheduled replacement of infrastructure, vehicles and equipment, <br />which can fluctuate from year to year <br />2004/2005 Achievements <br />• Distributed nearly 2.0 billion gallons of water to Roseville and Arden Hills utility customers <br />• Repaired 27 water main leaks <br />• Flushed, inspected, and maintained 1,750 fire hydrants <br />• Responded to over 4,000 locate requests from Gopher State One Call <br />• Completed all annual major maintenance programs on schedule and within budget <br />• Upgraded Arden Hills Meter Pits to newer technology <br />61VA <br />
The URL can be used to link to this page
Your browser does not support the video tag.