My WebLink
|
Help
|
About
|
Sign Out
Home
2011 Approved Budget
Roseville
>
Budget
>
2011 Approved Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 3:17:11 PM
Creation date
6/19/2012 3:10:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division / Program. General BuBding thaintenance <br />Organizational Responsibility. Public Works Director <br />a <br />Di V vision / Program Description <br />Building Maintenance provides general governmental building maintenance including janitorial services <br />and HVAC maintenance. Building maintenance is continuing to be a decentralized operation with th(;i <br />City, and longcr term planning for the implementation of a stronger program is continum'g. Thl� <br />Program's actives are accounted for in the General Fund. <br />Financial Summary <br />log <br />2011 Budget Impact Items <br />0 Increase attributable to the replacement of the City's fuel leak detection system. <br />2009/2010 Achievements <br />Provided building maintenance services at a reasonable cost to the public. <br />Maintained a clean environment for city staff and the public. <br />Worked to minm'ize disruption to all city operations and functions with maintenance program. <br />Attained significant savings through energy use reduction resulting from re-commissioning anoi <br />optimizations. <br />57 <br />2007 <br />2008 <br />2009 <br />2010 <br />2011 <br />$Increase <br />%Increase <br />Actual <br />Actual <br />Actual <br />i <br />B <br />(Decrease) <br />LDecreas <br />Personal Services <br />$ 79.936 <br />$ 7407 <br />$ 83175 <br />$ 711700 <br />$ 7700 <br />$ - <br />0.0% <br />Supplies & Materials <br />225,935 <br />219606 <br />213192 <br />241000 <br />245700 <br />700 <br />2.9% <br />Other Services & Charges <br />325�593 <br />323�571 <br />260,534 <br />351 J00 <br />347J00 <br />(41000) <br />-1.1% <br />Capital Outlay <br />15576 <br />- <br />39.896 <br />- <br />18500 <br />1 8P500 <br />0.0% <br />Total <br />$ 3585040 <br />$ 3529584 <br />S 2935.797 <br />$ 383400 <br />$3989600 <br />S 15200 <br />4,0% <br />log <br />2011 Budget Impact Items <br />0 Increase attributable to the replacement of the City's fuel leak detection system. <br />2009/2010 Achievements <br />Provided building maintenance services at a reasonable cost to the public. <br />Maintained a clean environment for city staff and the public. <br />Worked to minm'ize disruption to all city operations and functions with maintenance program. <br />Attained significant savings through energy use reduction resulting from re-commissioning anoi <br />optimizations. <br />57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.