My WebLink
|
Help
|
About
|
Sign Out
Home
2012 Approved Budget
Roseville
>
Budget
>
2012 Approved Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 3:21:09 PM
Creation date
6/19/2012 3:17:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville — 2012 Budget <br />Department /Program: Park Improvement Program <br />Organizational Responsibility: Parks &Recreation Director <br />Department Description <br />The Park Improvement Program (PIP) provides for the preservation of parks, open space, and related <br />recreational areas. The purpose of this fund is to renew and reconstruct existing park facilities. The <br />Program's activities are accounted for in the Park Improvement Fund. <br />2012 Goals and Objectives <br />• To update a 10 year parks and recreation capital improvement plan <br />• To update a 10 year project priority listing <br />• To focus on safety and aesthetics as a high priority <br />Financial Summary <br />FTE's <br />2012 Budget Impact Items <br />• A reduction in capital costs will be offset by bond - funded projects over the next 5 years. The <br />overall investment in park improvements will increase substantially. <br />2010/2011 Achievements <br />• Reconstructed Central Park Waterfall and surrounding retaining walls <br />• Maintained playground safety surfacing system wide <br />• Mulched all beds at Lexington Park using volunteer labor <br />• Renovated play area at Evergreen Park including all ages play feature with fabric shade structure, concrete <br />curbing and safety fencing. <br />• Replaced Bennett Lake Fishing Pier using grant funding from the Minnesota DNR <br />• Initiated trial system for trash and recycling removal using high capacity containers <br />70 <br />2008 <br />2009 <br />2010 <br />2011 <br />2012 <br />$ Increase <br />% Increase <br />Actual <br />Actual <br />Actual <br />Bind et <br />Budget <br />Decrease <br />Decrease <br />Personal Services <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />0.0% <br />Supplies & Materials <br />- <br />- <br />- <br />- <br />- <br />- <br />0.0% <br />Other Services & Charges <br />- <br />- <br />- <br />- <br />- <br />- <br />0.0% <br />Capital Outlay <br />2191823 <br />4101086 <br />761073 <br />1851000 <br />401000 <br />(145,000) <br />0.0% <br />Total <br />$ 2191823 <br />$ 4101086 <br />$ 761073 <br />$ 1851000 <br />$ 401000 <br /># # # # # # ## <br />-78.4% <br />FTE's <br />2012 Budget Impact Items <br />• A reduction in capital costs will be offset by bond - funded projects over the next 5 years. The <br />overall investment in park improvements will increase substantially. <br />2010/2011 Achievements <br />• Reconstructed Central Park Waterfall and surrounding retaining walls <br />• Maintained playground safety surfacing system wide <br />• Mulched all beds at Lexington Park using volunteer labor <br />• Renovated play area at Evergreen Park including all ages play feature with fabric shade structure, concrete <br />curbing and safety fencing. <br />• Replaced Bennett Lake Fishing Pier using grant funding from the Minnesota DNR <br />• Initiated trial system for trash and recycling removal using high capacity containers <br />70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.