Laserfiche WebLink
304 Chair Miller asked individual Board members to consider specific ideas for education and outreach <br />305 between now and the next Board meeting; including the audience(s) to reach; how to market that <br />306 educational/outreach effort; and other options to consider. <br />307 <br />308 Revised 2012 Budget/Remaining Funds (continued) <br />309 Discussion on remaining unencumbered funds ensued, with Mr. Petersen advising that this was the <br />310 GLWMO's remaining budget funds, entitled "2012 Budget," and that no further funding should be <br />311 anticipated from member cities. <br />312 <br />313 Mr. Schwartz cautioned that, pending how and when the organization was closed out, the Board should <br />314 continue to keep well - documented records of any expenditure for reporting and audit purposes. <br />315 <br />316 Ramsey Conservation District (RCD) 4" Quarter Technical Services Report and Technical Services <br />317 Contract for 2012 <br />318 Mr. Johnson provided, as a bench handout, attached hereto and made a part hereof, the RCD's year -end <br />319 2011 report. <br />320 <br />321 Mr. Johnson summarized the report, noting that the RCD had twenty (20) BMP sites in 2010, and that had <br />322 increased to thirty (30) in 2011, with seven (7) projects on one road, providing a significant aesthetic and <br />323 environmental impact. Mr. Johnson advised that those sites were effective, and created a lot of interest <br />324 from area residents. While seeing an increase in projects in the GLWMO, Mr. Johnson noted that Capitol <br />325 Region WSD continued to have the highest participation in BMP project, but only had two (2) lakes <br />326 (McCarron's and Como), other than smaller water bodies. <br />327 <br />328 Mr. Johnson highlighted the Eileen Stanley project for installation of the porous driveway materials, <br />329 estimated to capture one inch of rainfall annually, thereby pulling out 1/2 pound of phosphorus annually <br />330 from Lakes Owasso and Wabasso. <br />331 <br />332 Mr. Johnson referenced the Arthur project, pending since about 2010, and suggested that this be a priority <br />333 target area for Roseville and the GLWMO to consider due to its location on the south end of Lake <br />334 Owasso, and the timing for a project adjacent to that. Mr. Johnson noted that the bigger buffer plan and <br />335 oversized rain garden was estimated to capture 1.3 inches of annual rainfall and pull 1.5 pounds of <br />336 phosphorus. <br />337 <br />338 Mr. Johnson noted that the Reiland Ln. project in Shoreview had been approved by the GLWMO Board <br />339 last fall, and would provide a great opportunity for a BMP given the existing depression in that area, with <br />340 an anticipated pound or more of phosphorus kept out of Snail Lake. Mr. Johnson advised that it was a <br />341 good project, and the property owners were great to work with. <br />342 <br />343 Mr. Johnson noted, as previous discussed, a number of pending cost -share project that have designs <br />344 prepared and awaiting property owner initiation, with a number of them on Lake Judy providing a lot of <br />345 potential in that strip alone. Mr. Johnson anticipated that Mr. Petersen's phone contact with those <br />346 property owners having pending projects would be fruitful. <br />347 <br />348 Mr. Johnson advised that one significant BMP project on Lake Owasso in the works for the last nine (9) <br />349 months remained pending, but it would serve as an ideal project to move forward if Mr. Petersen's <br />350 contact with the property owner was successful. Mr. Johnson confirmed with Mr. Petersen that this <br />351 project should be a priority, since it would stop further erosion on a three feet (3') bank that was currently <br />352 sloughing into Lk. Owasso. <br />353 Mr. Johnson expressed his hope that other property owners with pending rain garden BMP's would take <br />354 the initiative to install them this year, also. <br />7 <br />