1 (b)LdLNew development property, or property which has altered its land use within the
<br />2 past three years, shall be assessed at 100% of the city's expense for the
<br />3 improvement.
<br />4 O-)LLSewer services shall be assessed on a per service basis at 100% of the city's
<br />5 expense for such services.
<br />6 ('lid) All side lots-or— iwm4iple +@fAag'e pafwigsliaD be ,1e4e f«.: «,.,1 4o L.... p 25
<br />7 ....1.1,. F,.,.t F,.« thp, F: «..t 1 cO F,.,.t ,.F.... :.1 14.1,. or-se") F «,. «t..,.,. ,.F «.. feel
<br />9 6. Storm Sewer Construction: There shall be no assessments for storm sewer projects not
<br />10 associated with roadway projects.
<br />11
<br />12 -5-7. Watermain Construction:
<br />13 (a) Properties currentiv connected to public watermain will not be assessed for
<br />14 reconstruction or major maintenance projects.
<br />15 (&)Lb)_Shall be assessed on a front footage basis with all types of land use and zoning
<br />16 being identically assessed.
<br />17 (b)(c) Any watermains in excess of 8 inches in diameter will normally be considered
<br />18 oversized. The added cost for oversizing watermain shall be subtracted from the
<br />19 total cost of the improvement. For eaek prey .«tl- ..41iz d pa feel t4.re win be
<br />20 .,..l.trae4.,1 4RM- the t t 1 .,.,,t R f*h
<br />: i f E «t 0 .,11ed .,.,t„ F.«
<br />21 ..t.«..:«, n«. « :4 0*600,,44:6 :4614„ :, 1
<br />:« ,1 :,.....t..... :11 «,......,.n. be
<br />22 P044qidl A-_ea ,._,...,.:,ea The result of said subtraction will be the cost to be
<br />23 assessed. This will be divided by the total number of assessable feet to establish
<br />24 the assessment rate for said prey . «t1_ „ ilized p flfee1
<br />25 (sjLdLNew development property, or property which has altered its land use within the
<br />26 past three years, shall be assessed at 100% of the city's expense for the
<br />27 improvement.
<br />28 (4)Le)_Water services shall be assessed on a per service basis at 100% of the city's
<br />29 expense for such services.
<br />30 (e ) All side lots of .....1t: «1 . f ,. «t,.... pate .1„ shall hp, 1 t :« 1 t,. 1.,... �c
<br />31 RSHASHablA 4R4 4r 414 F: «..t 150 444 F : l : 1 «a r «t FtL «,.....1
<br />32 .
<br />33 4-8 Pathway Construction: There shall be no assessments for off road pathway construction.
<br />34 -7-9. Streetlight Installation:
<br />35 (a) Shall be assessed on a front footage basis and as follows:
<br />36 (b) All properties within 150 feet (street frontage) of each light shall be considered
<br />37 for assessment.
<br />38 (c) City staff shall determine the number and locations of lights that could have been
<br />39 installed under the "standard street light" section of the City's Street light policy.
<br />40 The maintenance cost for these lights will be deducted from the overall project
<br />41 cost.
<br />42 (d) 100% of the additional costs for an "enhanced street light" project shall be
<br />43 specially assessed. The additional costs for an "enhanced street light" project
<br />44 shall include; cost of installation of enhanced streetlights, cost of operation &
<br />Assessment Policy Summary Page 3 of 4
<br />6/15/12
<br />
|