My WebLink
|
Help
|
About
|
Sign Out
Home
2012-09-25_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2012
>
2012-09-25_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 3:04:52 PM
Creation date
9/20/2012 2:44:48 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/25/2012
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Performance Measures and Results <br />The Public Works Department has established performance indicators and benchmarks to assure <br />that we make continuous progress toward reaching the goals and priorities identified above. <br />Local Benchmark: Number of annual water main breaks. <br />IR2025 Strategy: 12. C <br />Description: # of breaks in City's water main that were repaired. <br />Our Goal: Decrease the number of water main breaks. <br />Local Benchmark: Number of annual sewer backups. <br />IR2025 Strategy: 12. C <br />Description: # of verified sewer pipes clogged that created a backup in the system. <br />Our Goal: Decrease the number of sewer backups. <br />2009 <br />2010 <br />2011 <br />3 -Year Avg. <br />2012 thru 5/31/2012 <br />33 <br />28 <br />29 <br />30 <br />11 <br />Local Benchmark: Number of annual sewer backups. <br />IR2025 Strategy: 12. C <br />Description: # of verified sewer pipes clogged that created a backup in the system. <br />Our Goal: Decrease the number of sewer backups. <br />2009 <br />2010 <br />2011 <br />3 -Year Avg. <br />2012 thru 5/31/2012 <br />14 <br />15 <br />16 <br />15 <br />10 <br />Local Benchmark: Average Pavement Condition Index — City Streets <br />IR2025 Strategy: 12. C <br />Description: Overall annual pavement condition index number. <br />Our Goal: To maintain a pavement condition index of 80 or higher for City Streets. <br />2009 <br />2010 <br />2011 <br />3 -Year Av . <br />87 <br />86 <br />84 <br />85.6 <br />Local Benchmark: Average Pavement Condition Index — City Pathways <br />IR2025 Strategy: 5.A.5 <br />Description: Overall annual pavement condition index number. <br />Our Goal: To maintain a avement condition index of 70 or higher for City Pathways. <br />2009 <br />2010 <br />2011 <br />3 -Year Avg. <br />76 <br />74 <br />1 72 <br />74 <br />Local Benchmark: Average Pavement Condition Index — City Parking Lots <br />IR2025 Strategy: 12. C <br />Description: Overall annual pavement condition index number. <br />Our Goal: To maintain a avement condition index of 70 or higher for City Parking Lots. <br />2009 <br />2010 <br />2011 <br />3 -Year Avg. <br />79 <br />77 <br />1 76 <br />77.3 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.