Laserfiche WebLink
PROPOSED PIP PROJECTS (by Park) <br />Jeff Evenson August 28,2006 <br />FUNDING NEEDSImmediateFuture <br />Total <br />ACORN PARK <br />Tennis Court Maintenance (Color Coat)25,000.00$ <br />Tennis Court Maintenance (Full Re-construction)150,000.00$ <br />Landscape around shelter20,000.00$ <br />Patio at shelter$ 25,000.00 <br />New Lighting at shelter10,000.00$ <br />Gate for Shelter$ 10,000.00 <br />Remove and replace storage shelter ( Wood Frame structure)100,000.00$ <br />Shade picnic structures (2 @ 15,000)30,000.00$ <br />Disc golf improvements20,000.00$ <br />Field fencing (2 @ 75,000)$ 150,000.00 <br />Ammenities (Benches Grilles etc)5,000.00$ <br />Irrigation system upgtrades (High use areas)30,000.00$ <br />Hockey boards$ 10,000.00 <br />Material Bin$ 5,000.00 <br />Equipment Storage Boxes 2,000.00$ <br />$ 300,000.00 <br />Total Acorn Park$ 292,000.00$ 592,000.00 <br />Applewood Overlook <br />Ammenities$ 10,000.00 <br />Sign Planting area$ 5,000.00 <br />$ - <br />Applewood Overlook Total15,000.00$ $ 15,000.00 <br />Applewood Park <br />$ 60,000.00 <br />Play Eq <br />Sign Planting Areas with Irrigation15,000.00$ <br />$ 50,000.00 <br />Basketball Court Reconstuct <br />$ 110,000.00 <br />Applewood Park Total15,000.00$ $ 125,000.00 <br />Autumn Grove Park <br />Master Plan$ 20,000.00 <br />Tennis Court (Color Coat)10,000.00$ <br />Tennis Court (Full re-construct)$ 100,000.00 <br />New Shelter$ 400,000.00 <br />Re-construct fields with lighting (2-Irrigated Soccer Fields)350,000.00$ <br />Parking lots$ 150,000.00 <br />Play equipment upgrades (New concrete curb etc.)25,000.00$ <br />Irrigation in high use areas25,000.00$ <br />Loop pathway $ 30,000.00 <br />Shade picnic structures (2 @ 15000)30,000.00$ <br />Hockey Boards$ 10,000.00 <br />Sign Planting Areas with Irrigation20,000.00$ <br />Plaza area$ 25,000.00 <br />Equipment Storage Boxes 1,000.00$ <br />$ 100,000.00 <br />Total Autumn Grove Park1,096,000.00$ $ 1,196,000.00 <br />B-Dale Fields <br />Fencing$ 100,000.00 <br />Bleacher pads$ 10,000.00 <br />Player benches$ 5,000.00 <br />Field Maintenance (Fill OF low areas, re-do infield and warn. Trk)12,000.00$ <br />B-Dale Bocce Ball$ 6,000.00 <br />Material Bin$ 5,000.00 <br />Equipment Storage Boxes 1,000.00$ <br />$ 100,000.00 <br />Total B-Dale Fields39,000.00$ $ 139,000.00 <br /> <br />