Laserfiche WebLink
Bruce Russell Park <br />Tennis Court Reconstruction and lighting$ 100,000.00 <br />$ 75,000.00 <br />Playground Eq. <br />Shade Structure$ 15,000.00 <br />Gate in courts$ 5,000.00 <br />Equipment Storage Boxes 1,000.00$ <br />$ 175,000.00 <br />Total Bruce Russell21,000.00$ $ 196,000.00 <br />Central Park Dale West (Athletic Complex) <br />Picnic/Concession Building450,000.00$ <br />Parking lot upgrades50,000.00$ <br />Fence$ 60,000.00 <br />Sidewalk$ 40,000.00 <br />Lighting$ 100,000.00 <br />Landscaping$ 20,000.00 <br />Playground$ 100,000.00 <br />Plaza Area$ 50,000.00 <br />Irrigation for high use areas35,000.00$ <br />Bridge$ 40,000.00 <br />Kiosk$ 15,000.00 <br />West Sign planting area with Irrigation20,000.00$ <br />Material Bin$ 5,000.00 <br />Equipment Storage Boxes 2,000.00$ <br />$ - <br />Total CP Dale West987,000.00$ $ 987,000.00 <br />Central Park Lexington (Including West area) <br />Master Plan$ 50,000.00 <br />CP Entrance Plaza and Restroom Renovation600,000.00$ <br />CP Amphitheater and Lake Improvements350,000.00$ <br />Bennett Lake Lighting350,000.00$ <br />Natural resource restoration200,000.00$ <br />Amenities$ 50,000.00 <br />Bocce Ball Court re-construction25,000.00$ <br />Foundation Shelter250,000.00$ <br />Playground Eq (2 @ 80,000)$ 160,000.00 <br />Pathway Improvements80,000.00$ <br />Irrigation at high use areas50,000.00$ <br />Kiosks (2)$ 30,000.00 <br />Amenities$ 20,000.00 <br />Shade structures (5)60,000.00$ <br />Volleyball Courts (East Side)50,000.00$ <br />West Sign planting area with Irrigation20,000.00$ <br />Material Bin$ 5,000.00 <br />$ 160,000.00 <br />CP Lexington Total2,190,000.00$ $ 2,350,000.00 <br />CP Lions Shelter <br />Retaining Walls$ 20,000.00 <br />Kitchen Eq.$ 10,000.00 <br />Landscaping and regrading30,000.00$ <br />Sign planting area with irrigation15,000.00$ <br />Natural resource restoration10,000.00$ <br />CP Loins Shelter Total85,000.00$ -$ 85,000.00$ <br />CP Arboretum <br />Oriental Garden$ 150,000.00 <br />Multi-Use Facility$ 350,000.00 <br />Lighting and Electrical upgrades75,000.00$ <br />Arboretum Parking Lot150,000.00$ <br />Theme garden structure30,000.00$ <br />Theme Garden Benches8,000.00$ <br />Rotory woods$ 65,000.00 <br />Sensory Garden$ 35,000.00 <br /> <br />