Laserfiche WebLink
City Council Study Session <br />Monday, Jnly 16, 2007 <br />P�ge 17 <br />1 College; Brian Humphries, Facility Manager at Northwestern College; <br />2 and Dick Thompson of TKDA Consulting Engineers. <br />3 <br />4 Jay L�ndgren <br />5 Mr. Lindgren reviewed the process to-date and actions taken by the <br />6 applicant since the Planning Commission Public Hearing and public <br />7 comments; and reviewed the four (4) areas affecting the PUD. Those <br />S areas were related to elimination o� one parking structure {Building <br />9 # 19); reiocation of the new dorm building (building #24} southeast io <br />10 the other side of the existing dormitory (building #9}; and re- <br />].1 engineering of the main paxking ramp {building #23); along with in- <br />12 ternal road impacts. <br />13 <br />14 Mr. Lindgren noted that this was a land use approval related to zoning <br />15 and not a Site Plan review; and provided several graphic displays of <br />16 various building locations, and the design of the proposed architectur- <br />17 ally-pleasing parking structure to show its integration with the campus <br />18 and topography of the land. <br />i9 <br />20 Mr. Lindgren advised that changes were made to the proposed plans <br />2� following comments of .Arden Hills and Roseville neighbors and <br />22 noted the applicant's attempts to provide more screening on the east- <br />23 ern edge of the campus to alleviate concerns. <br />24 <br />25 Councilmember Pust noted that additional screening had been in place <br />26 in the past, but that s�orm damage over a number of years had reduced <br />27 that screening. <br />28 <br />29 Councilmember Kough asked about an access on the north of the <br />30 campus in Arden Hi�ls. <br />31 <br />32 Mr. Lindgren responded that pending approval by the City of Arden <br />33 Hills was conditioned that no outlet would be allowed on the north <br />34 end. <br />35 <br />36 Councilmember Ihlan expressed concern asked for a s�atus report on a <br />37 PUD Agreement, and whether that agreement would be completed <br />38 and made available io the City Council for adequate review prior to <br />39 the August 13, 2007 meeting. <br />