My WebLink
|
Help
|
About
|
Sign Out
Home
1994 PipelineSafety Task Force
Roseville
>
Studies, Task Forces, Special Committees, Reports
>
Pipeline Safety
>
1994 PipelineSafety Task Force
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 1:06:07 PM
Creation date
10/5/2012 11:46:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For example, #he risk could be minimized by the installation of <br />strategicaiiy located electrically operated-remotely controlled block <br />valves, encasing the pipe in concrete, cons#ructing a liquid retaining wall, <br />annua! pipeline inspections, the use of tarpaulins and sand to block the <br />flow of petroleum into the infirastructure and the availability and <br />procurement of inflatable (bull-bags) bags that can be inserted into the <br />storm sewer catch basins. <br />8-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.