Laserfiche WebLink
Langton Park Management Recommendat�on <br />Summary Tab�e <br />Community ; Activ�ty Pr�ority , Estimated Cost. , Cotnments . ,_`' *` <br />, �: <br />a; ` 4; �� <br />. ._ <br />, „ _ _ ; a � , > h�. <br />� �.. <br />LL-U1 Remove small High $2,0(� south end, Cut and treat akl stumps with 2�-SO�/o sotution <br />softwoodl pioneer $3,000 on north of Roundup or Garlon. Stack and burn brush <br />lrees, Buckthorn and portion, or 150-3Q0 in winter. Cut befare buming in any <br />other nonnative volunteer hours particular be�rn unit. Re-plant with natives <br />shrubs total. where bare soil exists. Also, cut �vhite <br />poplar near southwest lake overlook. <br />LL-W2 Remove buckthorn High $500-1,OU0 ncr Cut and treat all stumps with 25-SO�Io solution <br />acre, 40-100 oi Roundup or Garlon_ <br />volunteer hours per <br />acre <br />LL-U 1 Reintroduce High $1,000 - 2,000 per Critical for maintaining prairie and savanna <br />Prescribed Fire event communities. Burning should not be <br />conducted until brush clearing is completed. <br />Burn 2-4 times in first ten years and every 5- <br />10 as community stabilizes. Conduct <br />concurrently with seeding and cutting <br />LL-U1 Reintroduce native Medium- $100 — 2,{H){) ReinTroduce appropreate local origin plant <br />woodland edge hi�h depending o❑ materials through planting of piugs or seed, <br />species nuznber of species, particularly where bare ground is fe#t fram <br />plants, amount of brush cIearing. Broadcast during growing <br />seed_ season and/or dormant season seed <br />LL-WS Remove buckthorn IIigh $5(?0-1,000 per Cut and treat ali stumps with 2�-SO�Ic solution <br />acrc, 40-100 of Roundup or Garlon. <br />volunteer hours per <br />acre <br />LL-WS Burn Hi�h �1,000.00 Pre are site for seedin� help remove invasive. <br />LL-WS Seeding Hi�h $1,000.00 Supp3emental Seeding to enhance herbaccous <br />layer after burn and buckthorn removal. <br />LL-W2 Instail sediment trap Medium $3,�Od.�O Needed to reduce sedimentation in wetland <br />at parking lot and could provide secondary benefct to reduce <br />nutrients to Lanaton Lake. <br />LL-W2 Direct street tlow to Nledium $500.00 Berm to be constructed to direct flows to the <br />storm pond storm pond and catch basin. Cunrently <br />drainage from street is going over curb <br />directly into wetlands_ <br />LL-�V4 Fix skimmer Nledium $2,000.00 "This is rnorc for �vater quality benefits to <br />structure Lan�ton I.ake then the wetland. Skimmin� <br />helps removes oiis and other floatin� debris <br />so it will noi enter the downstream <br />waterbod . <br />LL-W4 Remove Lo�v $IO,�OO.QO Currently is wooded. Would only pursue to <br />sediment im rove water ualit to Lanaton Lake. <br />City af Rose��tlle 117 <br />Parks Nattrra! Resotrrce Ma�ragement <br />