My WebLink
|
Help
|
About
|
Sign Out
Home
2012_1119_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2012
>
2012_1119_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2012 11:37:13 AM
Creation date
11/15/2012 2:58:14 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2013 Fee Schedule <br /> <br /> 11 <br />Building Permit and Plan Review Fees - continued <br /> <br />Plumbing Permit Fee: <br /> <br />Description 2012 Amount 2013 Amount <br />Administrative/minimum fee $ 57.00$ 58.00 <br />Additional for each fixture opening 10.0010.00 <br />Miscellaneous work 1.28% of job cost1.28% of job cost <br />Backflow prevention verification $ 26.00$ 26.00 <br /> <br />Plan Review Fee: <br />When a building permit is required and a plan is required to be submitted, a plan checking fee <br />shall be paid. Plan checking fees for all build ings, except for construction costs in R-1 and R-2 <br />zones which do not involve new single family st ructures and are of le ss than seven thousand <br />dollars ($7,000.00), shall be sixty five percent (65%) of the build ing permit fee as set forth in <br />Section 901.06 of this chapter, except as m odified in M.S.B.C. Section 1300. (Ord. 1110, 4-13- <br />1992) <br /> <br />The plan review fees specified are separate fees from the permit fees and are in addition to the <br />permit fees. <br /> <br />When submittal documents are incomplete or change d so as to require additional plan review or <br />when the project involves deferred submittal items an additional plan review f ee shall be charged. <br /> <br />Expiration of plan review: <br />Applications for which no permit is issued within 180 da ys following the date of application shall <br />expire by limitation, and plans and other data subm itted for review may thereafter be returned to <br />the applicant or destroyed by the building official . The building official may extend the time for <br />action by the applicant for a period not exceedi ng 180 days on request by the applicant showing <br />that circumstances beyond the control of the app licant have prevented acti on from being taken. <br />No application shall be extended more than once. In order to renew acti on on an application after <br />expiration, the applicant shall resubmit pl ans and pay a new plan review fee. <br /> <br />Refund Fee: <br />The building official may authorize refunding of any fee paid hereunder which was erroneously <br />paid or collected. <br /> <br />The building official may authorize a refunding of permit fees paid when no work has been done <br />under a permit issued in accordance with this code. <br /> <br />The building official may authorize a refunding of pl an review fees paid wh en an application for a <br />permit for which a plan review fee has paid is withdrawn or canceled before any plan reviewing is <br />done. <br /> <br />The building official shall not au thorize refunding of any fee paid except on written application <br />filed by the original permittee not later than 180 days after th e date of fee payment.
The URL can be used to link to this page
Your browser does not support the video tag.