Laserfiche WebLink
City of Roseville 2013 Fee Schedule <br /> <br /> 12 <br />Building Permit and Plan Review Fees - continued <br /> <br />Sewer Connection Permit Fee – Planning & Zoning: <br /> <br />Description 2012 Amount 2013 Amount <br />Residential $ 87.00$ 90.00 <br />Commercial 280.00285.00 <br />Repair 57.0058.00 <br />Disconnect – residential 78.0080.00 <br />Disconnect – commercial $ 157.00$ 160.00 <br /> <br />Sewer Connection Permit Fee – Engineering: <br /> <br />Description 2012 Amount 2013 Amount <br />Residential $ 5.00$ 5.00 <br />Commercial 25.0025.00 <br />Repair 5.005.00 <br />Disconnect – residential 25.0025.00 <br />Disconnect – commercial 75.0075.00 <br /> <br />Sign Permit Fee: <br />Utilize building permit fee schedule. No plan review fee <br /> <br />Description 2012 Amount 2013 Amount <br />Permanent Sign – minimum fee $ 55.00$ 55.00 <br />Temporary Sign 25.0025.00 <br /> <br />Swimming Pool Permit Fee – Planning & Zoning: <br /> <br />Description 2012 Amount 2013 Amount <br />Residential In-ground pool $ 197.00$ 200.00 <br />Residential Seasonal pool 0.0025.00 <br /> <br />Commercial pool <br />Utilize building <br />Permit fee Schedule <br />Utilize building <br />Permit fee Schedule <br /> <br />Swimming Pool Permit Fee – Engineering: <br /> <br />Description 2012 Amount 2013 Amount <br />Residential pool $ 15.00$ 15.00 <br />Commercial pool -- <br />