Laserfiche WebLink
City of Roseville 2013 Fee Schedule <br /> <br /> 19 <br />Electrical Permit Fees - continued <br /> <br />O. For inspection of transient projects, including but not limited to, carnivals and <br />circuses, the inspection fees shall be computed as follows: <br /> <br /> Power supply units according to Item “B” of fee schedule. A like fee <br />will be required on power supply units at each engagement during the <br />season, except that a fee of $35.00 per hour will be charged for <br />additional time spent by the Inspecto r if the power supply is not ready <br />for inspections as required by law. <br /> <br /> Rides, Devises or Concessions: Shall be inspected at their first <br />appearance of the season and the in spection fee shall be $35.00 per unit. <br /> <br />P. The fee is doubled if the work st arts before the permit is issued. <br />