Laserfiche WebLink
139 The single largest operating cost to the sanitary sewer operation is the wastewater treatment costs paid to <br />140 the Metropolitan Council Environmental Services Division (MCES). Based on projected flows and <br />141 increased costs from the MCES, the budget for this category has been increased by 5 %. The City also <br />142 expects to have moderate increases in personnel and supply - related costs bringing the total increase to <br />143 5.7 %. The impact on the sewer rates will also be affected by these and other factors. <br />144 <br />145 The 20 -Year CIP calls for an average capital replacement need of $1 million annually. In contrast, current <br />146 sewer rates only provide $670,000 annually. Based on a recommendation of the CIP Task Force, the City <br />147 Council agreed in 2011 to adopt abase rate increase of approximately 60% to alleviate the funding gap. <br />148 The increase was to be phased in over two years beginning in 2012. For 2013, the increase is expected to <br />149 generate an additional $330,000 annually. The base rate would still need to be indexed for future <br />150 inflationary impacts. <br />151 <br />152 It is further recommended that the usage rate be increased by approximately 3.5% to offsetthe increase in <br />153 wastewater treatment and other operating costs. <br />154 <br />155 Storm Drainage Operations <br />156 The City provides for the management of storm water drainage to prevent flooding and pollution control, as <br />157 well as street sweeping and the leaf pickup program. The following table provides a summary of the 2012 <br />158 and 2013 (Proposed) Budget: <br />159 <br />160 <br />161 <br />162 <br />163 <br />164 <br />165 <br />The City expects to have moderate increases in personnel, supply and capital - related costs, which will <br />require an increase in the storm water rates. <br />Previously, the 20 -Year CIP called for an average capital replacement need of $972,000 annually. The <br />2011 storm water rates only provided $310,000 annually. <br />166 <br />167 To alleviate this shortfall, the CIP Task Force recommended a one -time base rate increase of approximately <br />168 65% in 2012. This was expected to generate an additional $660,000 annually and allow the Storm Water <br />169 Fund to provide for capital improvements over the next 20 years as well as increased operating costs. It <br />170 was noted at the time that the base rate would still need to be indexed for future inflationary impacts, <br />171 although no adjustment is needed for 2013. <br />172 <br />173 Recycling Operations <br />174 The recycling operation provides for the contracted curbside recycling pickup throughout the City and <br />175 related administrative costs. The primary operating cost is the amounts paid to a contractor to pickup <br />176 recycling materials. <br />177 <br />Page 5 of 12 <br />2012 <br />2013 <br />$ Incr. <br />(Decrease) <br />% Incr. <br />(Decrease) <br />Personnel <br />$ 316,837 <br />$ 324,615 <br />Supplies & Materials <br />55,301 <br />57,300 <br />Other Services & Charges <br />277,800 <br />281,000 <br />Depreciation / Ca ital <br />1,260,000 <br />1,369,000 <br />Total <br />$ 1,909,938 <br />$ 2,301,915 <br />$ 121,977 <br />6.4% <br />The City expects to have moderate increases in personnel, supply and capital - related costs, which will <br />require an increase in the storm water rates. <br />Previously, the 20 -Year CIP called for an average capital replacement need of $972,000 annually. The <br />2011 storm water rates only provided $310,000 annually. <br />166 <br />167 To alleviate this shortfall, the CIP Task Force recommended a one -time base rate increase of approximately <br />168 65% in 2012. This was expected to generate an additional $660,000 annually and allow the Storm Water <br />169 Fund to provide for capital improvements over the next 20 years as well as increased operating costs. It <br />170 was noted at the time that the base rate would still need to be indexed for future inflationary impacts, <br />171 although no adjustment is needed for 2013. <br />172 <br />173 Recycling Operations <br />174 The recycling operation provides for the contracted curbside recycling pickup throughout the City and <br />175 related administrative costs. The primary operating cost is the amounts paid to a contractor to pickup <br />176 recycling materials. <br />177 <br />Page 5 of 12 <br />