My WebLink
|
Help
|
About
|
Sign Out
Home
2012_1210_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2012
>
2012_1210_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2012 11:30:24 AM
Creation date
12/6/2012 4:30:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assessment Policy Summary Page 5 of 5 <br />11/19/12 <br /> <br />(c)(d) Long side: On a corner lot or multiple front age lot, the frontage of a property that 1 <br />is longest. 2 <br />(d)(e) Private Driveway: A driveway or road th at serves as a primary access for one or 3 <br />more property owners that is not maintain ed by the City of Roseville, MnDOT or 4 <br />Ramsey County. 5 <br />(e)(f) Required Drainage: Drainage impr ovements necessary because of an 6 <br />improvement project. This can be the result of meeting City, watershed or 7 <br />wetland requirements. Includes rate contro l, water quality treatment, infiltration, 8 <br />and wetland mitigation. 9 <br />(f)(g) Roadway Reconstruction Project: This type of project involves removing and 10 <br />replacing the existing roadway bituminous, more than 50% of the concrete curb, 11 <br />the base materials, and oftentimes perfor ming utility work (water, sewer, etc.) at 12 <br />the same time. 13 <br />(g)(h) Roadway Maintenance Project: Perfor ming a Reclaim and Overlay, Mill and 14 <br />Overlay, or sealcoating of city streets. 15 <br />(h)(i) Short side: On a corner lot or multiple fr ontage lot, the frontage of a property that 16 <br />is shortest. 17 <br />(i)(j) Standard Street Light: str eet light installation that m eets the location, design and 18 <br />spacing of the City street light policy qualifying conditions de scribed in section 19 <br />IV. B. of the City Street Light policy. 20 <br />(j)(k) Total Project Cost: Project costs incl ude actual construc tion cost plus all 21 <br />associated overhead costs. The total cost of the associated overhead for a public 22 <br />improvement project would typically include city ad ministration, engineering, 23 <br />fiscal, legal, capital inte rest, right of way acquisiti on and contingencies. 24
The URL can be used to link to this page
Your browser does not support the video tag.