<br />Project P -ST -SW -W -13 -02 Feasibility Report <br />County Road D Reconstruction <br />10 <br />CONCLUSIONS & RECOMMENDATIONS <br />A. All portions of the project proposed are feasible. <br />B. Estimated project cost : <br /> Project Cost <br />Street Reconstruction $445,816.53 <br />Sidewalk Construction $55,030.80 <br />Storm Sewer C onstruction $132,000.00 <br />Sanitary Sewer Reconstructio n $22,000.00 <br />Watermain Reconstruction $209,902 .00 <br />Engineering (15%) $129,712.40 <br /> <br />Total $994,461.73 <br />The following is a summary of the recommendations discussed in this report. <br />A. Construct the project in 2013 in partnership with the City of Shoreview <br />B. Construct a 6 ft wide concrete sidewalk along the south side of County Road D. <br />C. Between Lexington Avenue and Hafner Court - <br />• Construct a 33 ft wide, bituminous street with B -618 concrete curb and gutter. <br />• Prohibit parking on the south side of the road <br />• Provide a 3 ft shoulder on the south side of County Road D for bicycles. <br />• Provide an 8 ft shoulder on the north side of County Road D for bicycles and parking. <br />• Construct a right turn lane at Lexington Avenue <br />D. Between Hafner Court and Victoria Stre et <br />• Construct a 4 0 ft wide, bituminous street with B -618 concrete curb and gutter. <br />• Provide a 9 ft shoulder on the south side of County Road D for bicycles and parking. <br />• Provide a 9 ft shoulder on the north side of County Road D for bicycles and parking. <br />• Construct a right turn lane at Victoria Street. <br />E. Install a Radar Speed limit sign . <br />F. Install a pedestrian activated crosswalk flasher at Chatsworth Street. <br />G. Reconstruct the trunk watermain in the corridor. <br />H. Repair deteriorated sanitary s ewer manholes in the cor ridor. <br />I. Construct storm sewer improvements to address water quality in the corridor. <br />J. Fund the reconstruction project with Municipal State Aid funds , utility funds, assessments and <br />general fund as detailed this report. <br />K. Schedule a public hearing for the Coun ty Road D project on Monday, January 2 8 , 201 3 .