Laserfiche WebLink
<br />Project P -ST -SW -W -13 -02 Feasibility Report <br />County Road D Reconstruction <br />17 <br />During construction, staff will work with those property owners who wish to make driveway <br />improvements outside of the areas necessary for the road project . The cost of any private <br />driveway improvements is the property owner’s responsibility. <br />Efforts will be made to protect and retain the trees that currently exist in the right -of -way. <br />When necessary, however, trees will be removed to allow for the proposed improvemen ts. <br />One tree and one shrub are proposed to be removed to construct the sidewalk. <br />Staff will work with other public and quasi -public utilities to coordinate other utility <br />improvements with the street reconstruction project. Minor changes to the existing e lectric, <br />telephone, and cable TV may be necessary for this project. Special Considerations <br />All items in this se ction of the report have been presented and discussed with the residents <br />during th e p ublic involvement process. A. Street Design <br />As a part of any s treet design project, staff takes a comprehensive look at the road to be <br />reconstructed and identifies ways that the corridor can be improved for all users. When <br />considering the new street cross section it is important to take into account the existing str eet <br />alignment, right - of - way, traffic volume , surrounding land use, and parking needs. The existing <br />conditions for all of the following items were discussed in the previous section. What follows is <br />a discussion of the proposed street design <br />1. Pathway <br />Staf f is recommending th at the project include th e construction of a sidewalk along the <br />south side of the County Road D. This is consistent with existing City policies included in <br />the Pathway Master P lan and Comprehensive Plan . <br />The sidewalk will address the following items discussed in the Pathway Master Plan and <br />referenced in the Comprehensive Plan: <br />(Page numbers correspond to the Pathway Master Plan) <br />Safety (pg 15) <br />• The sidewalk will improve safety for children, senior citizens, people with <br />disabilities, p edestrians, bicyclists, students within school walking areas, and all <br />light traffic. <br />• Having sidewalks on both sides of County Road D will provide a safe alternative <br />for the school busing program. <br />Connectivity (pg 15) <br />• Currently there is a dead end si dewalk on the south side of County Road D at the <br />east end of the project. This sidewalk is adjacent to the Lutheran Church of the <br />Resurrection. The proposed sidewalk construction will connect t his dead -end <br />sidewalk to Lexington Avenue. The Pathway Master plan also includes Victoria <br />Street as a pathway priority segment providing a future loop for the area .