My WebLink
|
Help
|
About
|
Sign Out
Home
ord_1431
Roseville
>
City Council
>
City Council Ordinances
>
1400
>
ord_1431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2012 11:06:17 AM
Creation date
12/20/2012 2:47:42 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
11/19/2012
Ordinance #
1431
Ordinance Title
AN ORDINANCE AMENDING CHAPTER 314.05, FEE SCHEDULE ADOPTING THE 2013 FEE SCHEDULE
Ordinance Summary
c314
Ordinance Date Passed
11/19/2012
Ordinance Date Published
12/4/2012
Publication Type
Ordinance
Publication Newspaper
Review
Publication Date (lst)
12/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2013 Fee Schedule <br /> Electrical Permit Fees <br /> A. Minimum fee for each separate inspection of an installation, replacement, <br /> alteration or repair is limited to one inspection only: <br /> $ 35.00 $ 35.00 <br /> B. Services, changes of service, temporary services, additions, alterations or repairs <br /> on either primary or secondary services shall be computed separately: <br /> 0 to 300 amp $50.00 $ 50.00 <br /> 301 to 400 amp 58.00 58.00 <br /> 401 to 500 amp 72.00 72.00 <br /> 501 to 600 amp 86.00 86.00 <br /> 601 to 800 amp 114.00 114.00 <br /> 801 to 1,000 amp 142.00 142.00 <br /> 1,001 to 1,100 amp 156.00 156.00 <br /> 1,101 to 1,200 amp 170.00 170.00 <br /> Add $14 for each add'l 100 amps <br /> C. Circuits, installation of additions, alterations, or repairs of each circuit or sub- <br /> feeder shall be computed separately, including circuits fed from sub-feeders and <br /> including the equipment served, except as provided for in (D) through (K): <br /> dry <br /> O to 30 amp $ 8.00 $ 8.00 <br /> 31 to 100 amp 10.00 10.00 <br /> 101 to 200 amp 15.00 15.00 <br /> 201 to 300 amp 20.00 20.00 <br /> 301 to 400 amp 25.00 25.00 <br /> 401 to 500 amp 30.00 30.00 <br /> 501 to 600 amp 35.00 35.00 <br /> 601 to 700 amp 40.00 40.00 <br /> Add$5 for each add'l 100 amps <br /> D. Maximum fee for single-family dwelling shall not exceed $150.00 if not over <br /> 200-ampere capacity. This includes service, feeders, circuits, fixtures and <br /> equipment. The maximum fee provides for not more than two rough-in <br /> inspections and the final inspection per dwelling. Additional inspections are at <br /> the re-inspection rate. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.