My WebLink
|
Help
|
About
|
Sign Out
Home
ord_1431
Roseville
>
City Council
>
City Council Ordinances
>
1400
>
ord_1431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2012 11:06:17 AM
Creation date
12/20/2012 2:47:42 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
11/19/2012
Ordinance #
1431
Ordinance Title
AN ORDINANCE AMENDING CHAPTER 314.05, FEE SCHEDULE ADOPTING THE 2013 FEE SCHEDULE
Ordinance Summary
c314
Ordinance Date Passed
11/19/2012
Ordinance Date Published
12/4/2012
Publication Type
Ordinance
Publication Newspaper
Review
Publication Date (lst)
12/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2013 Fee Schedule <br /> Electrical Permit Fees- continued <br /> E. Maximum fee on an apartment building shall not exceed $70.00 per dwelling <br /> unit. A two-unit dwelling (duplex) maximum fee per unit as per single-family <br /> dwelling. <br /> F. The fee for remote control/signal circuits is $0.75 per device. <br /> G. In addition to the above fees: <br /> 1) A charge of$4.00 will be made for each street lighting standard. <br /> 2) A charge of$7.00 will be made for each traffic signal standard. Circuits <br /> originating within the standard will not be used when computing fees. <br /> H. In addition to the above fees, all transformers and generators for light, heat and power <br /> shall be computed separately at $8.00 plus $.40 per KVA up to and including 100 <br /> KVA. 101 KVA and over at $.30 per KVA. The maximum fee for any transformer or <br /> generator in this category is$80.00. <br /> I. In addition to the above fees, all transformers for signs and outline lighting shall <br /> be computed at $8.00. <br /> J. The fee for retro fit lighting is $0.65 per light fixture. <br /> K. In addition to the above fees, the inspection fee for each separate inspection of a <br /> swimming pool shall be computed at $35.00. Reinforcing steel for swimming <br /> pools requires a rough-in inspection. <br /> L. For the review of plans and specifications of proposed installations, there shall <br /> be a minimum fee of$150.00 up to and including $30,000 of electrical estimate, <br /> plus 1/10 of 1% on any amount in excess of $30,000 to be paid by permit <br /> applicant. <br /> M. When re-inspection is necessary to determine whether unsafe conditions have <br /> been corrected and such conditions are not subject to an appeal pending before <br /> any Court, a re-inspection fee of $35.00 may be assessed in writing by the <br /> Inspector. <br /> N. For inspections not covered herein, or for requested special inspections or <br /> services, the fee shall be established separately. <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.