My WebLink
|
Help
|
About
|
Sign Out
Home
2013-01-10_PR_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2013
>
2013-01-10_PR_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2013 4:44:23 PM
Creation date
1/4/2013 4:36:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville 2012 -2016 Parks and Recreation Renewal Program <br />Public engagement strategy <br />Page 4 <br />Engagement Inform <br />format <br />Consult <br />Collaborate <br />Engagement <br />To provide the public <br />To assess a park and <br />To more fully and <br />purpose <br />with correct and timely <br />evaluate potential <br />directly engage the <br />information regarding a <br />changes during a series <br />public, especially <br />planned park <br />of meetings with both <br />neighbors and park <br />improvement <br />interactive and passive <br />users and user groups, <br />engagement activities <br />in the planning and <br />........ ......... .................................................................................................................................................................................................................................... <br />during each meeting <br />............................... <br />design of a park <br />Anticipated <br />Reconstruction of a <br />Significant <br />Creation of new <br />change in park <br />park component in the <br />improvements i <br />facilities with more <br />same or nearly the <br />(more than <br />�Oj <br />broad influence on the <br />same location without a <br />replaceme � � aft � %i�� <br />use and intensity of the <br />change in activity or <br />compo s the <br />" "'������,,,,, park, creation of a new <br />intensity of use <br />sam �'�on) <br />,!� k or park facility <br />Project types Playground <br />replacement, court <br />replacement, field <br />improvements, <br />irrigation <br />improvements <br />mr t <br />General meeting One m atively <br />description sho f� oft <br />090 <br />min <br />A with a new <br />buil ltOasis, <br />Rosebr ° 3 <br />m, ....... <br />to <br />wit' "l meetings <br />duri ncept <br />lannirl age and one <br />6M fi�Jjlldesign <br />"Inform" format: meetingo'�h , #dents and stakeholders <br />vement projects <br />with - -� ificant <br />i <br />comp) I � nd <br />requiring blic <br />contributions during <br />planning process; <br />Southwest Roseville <br />One meeting up to <br />three hours to kick off <br />the concept planning <br />stage, followed by one <br />or two meetings up to <br />two hours each to <br />conclude the concept <br />planning stage, and one <br />meeting during final <br />design <br />Many improvements anticipated as part of the renewal program provide replacement or upgrades to <br />park components without changes in location of the component or in the intensity of use. For these <br />park improvements, providing information to the public and park stakeholders during a single meeting <br />(along with other notifications via media, email, web notices, or other written communications) should <br />suffice. This meeting might best occur in an open house format using the following agenda as a guide: <br />Open House Meeting Agenda <br />Item Topic Description Time allowed <br />1 Introduction Introductions of parks and recreation staff, 2 minutes <br />........ ......... ......... ......... <br />
The URL can be used to link to this page
Your browser does not support the video tag.