Laserfiche WebLink
City of Roseville <br />2072 -2075 Parks and Recreation Renewal Program <br />Implementation schedule <br />26- Dec -72 <br />IMI <br />Project type <br />Component Description <br />Autumn Grove Park <br />Autumn Grove Park <br />Autumn Grove Park <br />B2 trail <br />Central Park Victoria BaIlPields <br />Central Park Victoria BaIlPields <br />Central Park Victoria BaIlPields <br />Central Park Victoria BaIlPields <br />Harriet Alexander Nature Center <br />Harriet Alexander Nature Center <br />Lexington Park <br />Lexington Park <br />Lexington Park <br />Materion Park <br />Roseb roo k Park <br />Roseville Skating Center <br />Tamarack Park <br />Villa Park <br />Villa Park <br />Villa Park <br />Southwest Roseville <br />Natural resources <br />approximately 2250 square foot building, Including storage, restroones, gatherings <br />spaceis), office, utility room <br />acquisition from Mounds View Schools; does not Include major site development <br />Lind equipment, permanent surface, concrete edge <br />estroom facilities, storage area, concessions room, and covered picnic <br />of two fields In six field complex, Improve soil conditions, upgrade fencing, <br />;at'ion to two -wire system, upgrade lighting, shade struct— for bleachers <br />to be determined through commr nit Input, rser group and Friends' recommendation, <br />with attention to sustalnablllty and accessibility <br />complete loop and provide teaching areas <br />a pproximately 2250 so ua to fcct, Including storage, restroo s, gatherings spaceisl, office, <br />L tillty room <br />permanent base and boards, lighting Improvement's <br />upgrade to two -wire system, add Irrigation to parkland along Lexington Avenue <br />new playground equipment, permanent surface, concrete edge <br />acquisition of Press Gym property; estimate based on Ramsey Countyonllne real estate <br />records <br />exterior painting and maintenance <br />new playground equipment, permanent surface, concrete edge <br />permanent base and boards, lighting Improvement's <br />approximately 1200 square Peet, Including storage, restrooms, gathering space, office, <br />L tillty room <br />replace Or bridges <br />site acquisition slteisl yet to be determined <br />Meeting type <br />Inform One meeting In the year of construction <br />Consult Two mectings during concept planning; one meeting during final design; one meeting one month <br />prior to start of construction <br />Collaborate Two meet ngs du ring concept planning; one meeting during final design; one meeting one month <br />prior to start of construction <br />Meeting <br />Type Set Meeting Meeting Approval Meeting Meeting <br />Meeting <br />Consult <br />7 <br />4- Mar -13 <br />1- Apr -13 <br />2- Apr -13 <br />Inform <br />2 <br />14- Mar -13 <br />2- Apr -13 <br />Consult <br />3 <br />7- Mar -13 <br />28- Mar -13 <br />2- Apr -13 <br />Consult <br />5 <br />2- Feb -13 <br />2- Mar -13 <br />2- Apr -13 <br />Consult <br />6 <br />12- Feb -13 <br />14- Mar -13 <br />2- Apr -13 <br />Consult <br />3 <br />7- Mar -13 <br />28- Mar -13 <br />2- Apr -13 <br />Consult <br />3 <br />11- Apr -13 <br />28- Mar -13 <br />2- Apr -13 <br />Inform <br />2 <br />14- Mar -13 <br />2- Apr -13 <br />Consult <br />3 <br />7- Mar -13 <br />28- Mar -13 <br />2- Apr -13 <br />Consult <br />3 <br />7- Mar -13 <br />28- Mar -13 <br />2- Apr -13 <br />Collaborate 8 11- Apr -13 9- May -13 7hn -13 <br />DRAFT <br />Rosevill e ParksR u—l- I, ""'I'Y' Impl —n-I. schedule <br />Renewalp So 13 December2 2 page1 <br />