Laserfiche WebLink
BOLTON & MENK, INC. <br />PLANS & SPECIFICATIONS REVIEW <br />• Review of standard City documents and details (such as technical specs and standard plates) included <br />in construction documents for compatibility with proposed improvements. <br />• Review of roadway and turn lane geometrics and grades against applicable Ramsey County, Mn/DOT <br />and ADA standards. <br />• Review of storm water management and erosion/ sediment control plans against MPCA standards. <br />• Review of submitted storm water calcularions. <br />• Review of proposed pavement sections (including reinforcement) against available project soils <br />information and concrete pavement design guidelines. <br />• Research for possible public and private utility conflicts <br />• Review of recommended concrete and bituminous mix designations. <br />• Review of landscaping plans and details. <br />• Review of project bid item quantities. <br />• Research for possible discrepancies between plan details and specification requirements. <br />• Preparation of review memo and redlines for implementation by Wal-Mart's engineer. <br />CONSTRUCTION OBSERVATION AND ADMINISTRATION <br />• Attendance at preconstrucrion meering and all regular construction progress meetings. <br />• Serve as liaison to City and County for communicarions to the project contactor. <br />• Assist in coordination of wark between public and private improvement projects in the area. <br />• Review of construction wark in accordance with approved plans and specifications and requirements <br />of the Response Acrion Plan. <br />• Coordination of construction materials tesring in accordance with specification requirements. <br />Assume testing is completed by others. <br />• Maintain record of materials test results. <br />• Preparation of pay estimates and contract change orders (if necessary). <br />• Maintain daily documentation of construction progress. <br />• Project punch list administration and close out documentation. <br />Construction observation and administration services will be provided on an hourly basis in accordance <br />with the construction contract timelines and actual contractor progress. For the purpose of this proposal, <br />construction observation and administration time is estimated at 45 hrs/wk and 8 hrs/wk, respectively, <br />over six (6) weeks. <br />PROJECT STAFFING <br />Bolton & Menk identifies and provides staff to projects based on our client's specific needs and <br />requirements. The following staff will serve as primary personnel to the City of Roseville for this project: <br />Marcus Thomas, P.E. will serve as overall Project Manager and will lead the plan and specificarion <br />review efforts. He will also lead the construction administration efforts. <br />Kelly Henry, MS and Chantill Kahler-Royer will complete the review of the Phase I, Phase II, and <br />Response Action Plan for the project. <br />Jason Schmidt, P.E., will assist with the roadway geometric and pavement design reviews. <br />Bob Flaws and Mark Lynch are construction observers available for this project and will be assigned <br />based on the City's input on the selecrion. <br />Full resumes for the staff identified above are included as an attachment to this <br />proposal. <br />Wal-Mart Twin Lakes Public Improvements <br />City of Roseville, Minnesota Page 2 <br />