My WebLink
|
Help
|
About
|
Sign Out
Home
2013_0128_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2013
>
2013_0128_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 11:34:31 AM
Creation date
1/25/2013 3:04:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
590
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ FINANCIAL IMPACTS <br />2 We received six bids for the 2013 Sanitary Sewer Main Lining Project. A bid alternate was <br />z���� included in the event bid prices were favorable, allowing for an increase in the project without a <br />z change order. The low bidder for each alternate was a different contractor. The low bid for Total <br />z��� B(Segment 1 plus Segment 2 plus Segment 3), submitted by SAK Construction, LLC, <br />2� $1,174,835.25, is within the budgeted amount for this project. However, staff recommends <br />�� eliminating one pipe segment from Segment 3. The per foot cost far a 36" diameter pipe was <br />2� significantly higher than anticipated due to higher traffic in the project area. Staff will evaluate <br />s� other alternatives for this segment, or include it in a future project. The revised contract total is <br />s� $1,150,835.25. We recalculated the low two bids to ensure that there was no change in low bidder <br />s as a result of eliminating this segment. The change did not result in a change in bidding order as <br />shown below. <br />BIDDER TOTAL B <br />(eliminatin 36" ipe from Se ment 3) <br />SAK Construction, LLC $1,150,835.25 <br />Insituform Technologies USA, LLC $1,168,391.10 <br />� This work is funded by Sanitary Sewer Infrastructure Funds and grant monies obtained from the <br />a�_ Metropolitan Council Environmental Services for improvements that will reduce inflow and <br />infiltration. <br />� REQUESTED COUNCIL ACTTON <br />� Motion approving a resolution awarding a bid for the 2013 Sanitary Sewer Main Lining Project in the <br />s�� amount of $1,150,835.25 to SAK Construction, LLC, of O'Fallon, Missouri. <br />Prepared by: Kristine Giga, Civil Engineer <br />Attachments: A: Resolution <br />Pagc 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.