My WebLink
|
Help
|
About
|
Sign Out
Home
2013_0128_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2013
>
2013_0128_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 11:34:31 AM
Creation date
1/25/2013 3:04:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
590
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Section 4.3.3 of the Original Contract is hereby amended in its entirety to read as follows: <br />"Except for the inspection meeting described in Section 3.3.29 which is <br />included in the Construction Manager's Basic Service Fee, if: a) the <br />services covered by this agreement have not been completed before <br />September 30, 2013 through no fault of the Construction Manager, and b) <br />the parties agree in writing to extend the Construction Manager's Services <br />beyond that time, extension of the Construction Manager's Services shall <br />be compensated as Additional Services using the rate set forth in Exhibit <br />B. The Construction Manager shall be compensated as set forth in <br />Original Contract and this Contract Amendment No. 1 through September <br />30, 2013." <br />7. The parties agree that except as hereby amended all other terms and conditions of the <br />Original Contract shall remain unchanged. <br />CITY OF ROSEVILLE, MINNESOTA <br />: <br />Daniel J. Roe, Mayor <br />By: <br />William J. Malinen, City Manager <br />� <br />BOSSARDT CORPORATION <br />I� <br />Steve Kilmer, <br />Senior Vice President/C.O.O. <br />
The URL can be used to link to this page
Your browser does not support the video tag.