Laserfiche WebLink
• Receive mill and overlay when deemed preventative maintenance will not <br /> benefit pavement life <br /> Poor condition <br /> • Minimize maintenance dollars <br /> • Reconstruction <br /> Mr. Schwartz noted that priorities are based on condition, as well as proximity to <br /> other construction projects; provided examples of various street conditions; and <br /> addressed installation of curb and gutter as part of projects, with the only street <br /> without City jurisdiction at this time not having curb and gutter was Victoria <br /> Street south of County Road B. <br /> Mr. Schwartz also provided a number of twenty (20)-year graphs, as a bench <br /> handout, regarding current funding levels and budgets versus a backlog for capital <br /> improvements, as used by staff in budget modeling for current spending and <br /> current street conditions for recommendation to the City Manager and City <br /> Council for future funding needs in the PMP. Mr. Schwartz noted the current <br /> 80% overall condition network versus how it diminished at the end of twenty (20) <br /> years for the overall PCI. Mr. Schwartz noted that a significant part of this <br /> diminished fund availability was due to reduced interest rates and return on <br /> investment for the PMP at approximately a 3% return versus previous returns of <br /> between 5-7%. Mr. Schwartz noted that other impacts were inflation related, as <br /> well as increased cost of materials while interest rates continued to decline. <br /> Mr. Schwartz noted the dramatic difference shown by the graphs in maintaining <br /> street conditions in "perfect" condition; assumptions of the program for bringing <br /> segments up to 100% compared to the City's standard practice to achieve an <br /> overall condition at 75-80%; and whether the City needed to reconsider desired <br /> standards for future maintenance and construction. Mr. Schwartz noted that <br /> pavements as now constructed throughout the City lasted about thirty (30) years <br /> versus projected twenty (20) years, particularly lesser traffic volume streets. <br /> Discussion included projected traffic patterns in the future (e.g. fewer and lighter <br /> cars, more bicycles, economics, and trends of multi-modal options) dependent on <br /> which part of the metro area was addressed (e.g. inner-ring suburbs versus those <br /> further out). <br /> Mr. Schwartz noted that there were a number of variables affecting road <br /> conditions, including the type of traffic, and impacts of freeze/thaw cycles. <br /> Further discussion included private streets inadvertently included on the condition <br /> map; current projections by staff to the City Manager and City Council over the <br /> next 3-7 years to add an additional $1 million funding to the PMP to maintain <br /> current PCI, and allowing time to make adjustments during that period based on <br /> how the fund perform; with the CIP Task Force addressing that with their <br /> Page 8 of 11 <br />