Laserfiche WebLink
Regular City Council Meeting <br /> Monday,January 28,2013 <br /> Page 11 <br /> a. Receive Arizona State University Best Value Presentation <br /> Presentation by Dr. Dean Kashiwagi, Professor at the Arizona State University, <br /> and founder of the Beset Value PIPS Contract Model <br /> Recess <br /> The City Council returned to the dais and Mayor Roe reconvened the regular business meeting at <br /> approximately 7:38 p.m. <br /> 11. Public Hearings <br /> a. Public Improvement Hearing for the Reconstruction of County Road D be- <br /> tween Lexington Avenue and Victoria Street <br /> A revised Feasibility Report (Project P-ST-SW-W-13-02) for County Road D Re- <br /> construction from Lexington Avenue to Victoria Street, with attached maps and <br /> citizen petition, was provided as a bench handout. The citizen petition was to <br /> communicate to the City Council that residents/property owners on County Road <br /> D West did not want a sidewalk added to the south side of the road, and to keep <br /> the width of the road and curb position as close as possible to its present state. <br /> Mayor Roe introduced City Engineer Debra Bloom for staffs presentation, as de- <br /> tailed in the RCA dated January 28, 2013, provided a brief statement on the pro- <br /> cess for public hearings. <br /> City Engineer Bloom reviewed this joint City of Shoreview/City of Roseville pro- <br /> ject, advising that her presentation would be specific to the City of Roseville's <br /> portion of the joint project, and based on the City of Roseville Assessment Policy, <br /> with a few staff-recommended amendments to proposed funding for the project <br /> outside of that current Policy. <br /> Ms. Bloom noted the public information meetings held to-date, and reported that <br /> 60% of the plans had been completed to date on the project: <br /> August 8, 2012 General Information Meeting with Residents <br /> October 4 Presentation of Preliminary Design <br /> October 27 "Walk Thru"Meeting on Site with Residents <br /> November 29 Feasibility Report Presentation <br /> January 28, 2013 Tonight's Public Hearing <br /> Ms. Bloom reviewed the various design elements, including street design; traffic <br /> management; sidewalks; required drainage; public utilities; residential driveways; <br /> sanitary services; and private underground utilities (Xcel gas, Qwest; Comcast) <br /> included in the overall project. Ms. Bloom reviewed three sections of the project <br /> design between Lexington Avenue and Victoria Street with dividing lines for <br /> those sections at Chatsworth Street, Hafner Street, and Victoria Street. <br /> Specific to sidewalk construction, Ms. Bloom noted receipt of the citizen petition <br /> signed by eleven (11) of the twenty (20) affected properties in Roseville, asking <br />