My WebLink
|
Help
|
About
|
Sign Out
Home
2013_0415_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2013
>
2013_0415_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2013 1:51:15 PM
Creation date
4/11/2013 3:54:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Included in your packet is Lexington Park as an example of a process and a preliminary plan set that staff <br />36 <br />will briefly review with you at the meeting to provide you with an idea of the actual process and input we <br />37 <br />are gathering from the neighborhoods and community. Michael Schroeder, LHB will be at both your <br />38 <br />meetings in May to review all completed preliminary plan sets to date. The next step then will be to <br />39 <br />complete the detailed construction plans and specifications for the projects and begin work in the fall. <br />40 <br />41 <br />There is an extensive playground and natural resource emphasis to the Renewal Program. Specifically <br />42 <br />there will be a $1.6M investment in the replacement of playgrounds and a $1.5M investment in natural <br />43 <br />resource attention system wide. Most preliminary plans mentioned above will include a component of <br />44 <br />each where they are either existing and/or practical. <br />45 <br />46 <br />Using the Best Value Business Model, with City Attorney and Arizona State University (ASU) guidance, <br />47 <br />request for proposals (RFP’s) were issued for playground vendors and for natural resource project <br />48 <br />th <br />consultants on January 18, 2013. The RFP’s were advertised online and in all known locations. <br />49 <br />50 <br />There were seven playground vendors that responded to the RFP. The evaluation team consisted of six <br />51 <br />individuals, including city staff and a member from the Parks and Recreation Commission. Through the <br />52 <br />process, a Best Value Vendor has been identified. City staff, City Attorney and ASU are working <br />53 <br />through the clarification phase and plan to bring a contract for you to consider on April 22, 2013. <br />54 <br />55 <br />There were two natural resource vendors that responded to the RFP. The evaluation team consisted of six <br />56 <br />individuals, including city staff and a member from the Parks and Recreation Commission. Through the <br />57 <br />process, a Best Value Vendor has been identified. City staff, City Attorney and ASU are working through <br />58 <br />the clarification phase and plan to bring a contract for you to consider on April 22, 2013. <br />59 <br />60 <br />The next Best Value process is to select a consultant for final design, plans and specifications for the <br />61 <br />remainder of the Renewal Program. Requests for Proposals were released on April 8, 2013 with a <br />62 <br />deadline for submission on April 30, 2013. This is the largest design portion of the planning and <br />63 <br />management budget that was originally outlined for the entire program. The budget for this portion is <br />64 <br />$790,000. This is for detailed plans, specifications and final design only; construction management <br />65 <br />services will not be required. <br />66 <br />67 <br />All Parks and Recreation Renewal related information is on the city website at www.cityofroseville.com, <br />68 <br />and then click on the Parks and Recreation Renewal tab on the left side of the screen. You can go into <br />69 <br />each project by location and view the meeting agendas, summary of the meetings and the preliminary <br />70 <br />plans. Information is also available at City Hall; feel free to contact staff for a review. <br />71 <br />72 <br />Staff will be prepared to review status of the Park and Recreation Renewal Program with you at your <br />73 <br />meeting. <br />74 <br />RCA <br />EQUESTEDOUNCILCTION <br />75 <br />Discussion, questions and guidance <br />76 <br />77 <br />Prepared by: Lonnie Brokke, Parks and Recreation Director <br />78 <br />79 <br />Attachment: a. Lexington Park process and preliminary plans <br />80 <br />81 <br />Page 2 of <br />2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.