My WebLink
|
Help
|
About
|
Sign Out
Home
2013_0415_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2013
>
2013_0415_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2013 1:51:15 PM
Creation date
4/11/2013 3:54:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br /> <br /> <br /> <br />Lexington Park <br />Implementation Planning Session One <br />12 February 2013 <br />19 Attendees signed in <br /> <br /> <br />Meeting input <br /> <br />Following an overview of the Parks and Recreation Renewal Progra <br />Lexington Park, work session participants were asked to respond to questions about the <br />evolution of the park under the renewal program. Responses are included in this summary. <br /> <br />At the end of the session, participants were asked to prioritize <br />work session as individuals. <br /> <br />Exercise One Issues <br /> <br />As a large group, participants were asked to share their thoughts about issues that needed <br />to be resolved at Lexington Park. Responses included: <br /> <br />Eldridge and Lexingtonriding bikes on the streetno circuit through the parknot safe <br />Works better with two soccer fields, not threesoccer balls in neighbors yards <br />Not enough picnic tables <br />More things for older kids and younger adults and families <br />Make better use of the inside of the rink <br />Warming house open longermore hours <br />No drinking fountains <br />Not enough bike racks or trash receptacles <br />Dog waste <br />Last quarter of the play area as a water play area would bring a lot more people to the park <br />Keep trees! <br /> <br />Exercise Two Complete/not complete <br /> <br />Work session participants worked in small groups to assess the priority for items identified <br />in the master plan for Lexington Park that had not been completed. Responses included: <br /> <br />Park component Priority <br /> Group 1 Group 2 <br />Play structure shelter Low Medium <br />(more trees) <br />Interior walksHigh High <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.