Laserfiche WebLink
Attachment C <br />Overlap <br />between <br />Programmed <br />Parks and <br />for street <br />PubWorks <br />reconstruction <br />Master <br />Proposed revised description to consolidate Parks and PWET plans or for <br />Park <br />master <br />in next 5 <br />Plan # <br />Priority # <br />Project Name <br />Original Description <br />other updates <br />Matrixes <br />plans? <br />Completed? <br />years? <br />Develop pathway facilities, both on and off road between Cleveland and <br />1 <br />20 <br />County Road D <br />Fairview Ave <br />keep <br />b <br />n <br />n <br />n <br />Develop both on and off road pathways within the County Road C -2 <br />Develop both on and off road pathways within the County Road C -2 <br />alignment from the west City Boundary to Snelling Avenue. This corridor <br />alignment from the west City Boundary to Hamline Avenue. This corridor <br />2 <br />25 <br />County Road C -2 West <br />would include a grade seperated crossing of 35W. <br />would include a grade seperated crossing of 35W. <br />a,b,c <br />y <br />n <br />n <br />Develop both on and off road pathways within the County RC -2 alingment <br />Develop both on and off road pathways within the County RC -2 alingment <br />3 <br />26 <br />County Road C -2 East <br />from the Snelling Ave to Victoria St <br />from the Lexington Ave to Victoria St <br />d <br />n <br />n <br />n <br />4 <br />6 <br />County Road C <br />Construct an on -road bicycle facility from Lexington Ave to Rice Street <br />keep <br />d,e,g,f <br />n <br />n <br />n <br />County Road C <br />Construct a sidewalk on the north side of County Road C from Western to <br />5 <br />11 <br />Sidewalk <br />Rice Street. <br />keep <br />d,e <br />y <br />n <br />n <br />Develop sidewalk from Lexington Ave to Rice Street, providing 3 <br />north /south connections to Central Park, 1 connection to Acorn Park, and 1 <br />6 <br />2 <br />County Road B -2 <br />Develop sidewalk from Lexington Ave to Rice Street <br />connection to Materion Park. <br />g,f <br />y <br />n <br />n <br />An off -road trail system will provide east/west connectivity from Cleveland <br />Ave to Highway 280 via County Road B, north /south connectivity along 280 <br />and a southern east/west connector along Roselawn Ave back to <br />7 <br />4 <br />County Road B <br />An off -road trail will provide connection from Highway 280 to Cleveland Ave <br />Cleveland Ave <br />j <br />y <br />n <br />n <br />8 <br />13 <br />Roselawn Ave <br />Develop both on road and offroad pathways from TH 280 to Lexington Ave <br />eliminate and consolidate with project master plan # 7 <br />j <br />y <br />n <br />n <br />9 <br />22 <br />Larpenteur Ave <br />An off -road trail from Reservoir Woods to Galtier Street <br />keep <br />n <br />n <br />n <br />n <br />Develop pathway, both on and off road, between County Road C and <br />10 <br />21 <br />Cleveland Ave <br />County Road D <br />keep <br />b <br />n <br />n <br />n <br />Development of both on -road and off -road pathways between County Road <br />11 <br />10 <br />Fairview (north of B -2) <br />B -2 and County Road D <br />keep <br />i,b <br />y <br />n <br />n <br />Development of both on -road and off -road pathways between Roselawn <br />12 <br />3 <br />Fairview (south of B -2) <br />Ave and County Road B -2. <br />y <br />Work with Arden Hills to develop a regional pathway connection along <br />Snelling Ave to Old Snelling Ave in Arden Hills connecting Roseville to <br />TH 51 Connection to Old <br />Mounds View High School, Valentine Hills Elementary School, Bethel <br />13 <br />16 <br />Snelling <br />College, Lake Johanna Park, and County Road E2 commercial businesses. <br />keep <br />b <br />n <br />n <br />n <br />14 <br />17 <br />Hamline Ave <br />An off -road trail from County Road B -2 to TH 51 (snelling) <br />keep <br />h,c <br />y <br />n <br />n <br />Develop and and off road trail on the east side of Lexington Ave from <br />Larpenteur Ave north through the City connecting to Shoreview. Also <br />Develop and off -road trail on the east side of Lexington Ave from Larpenteur <br />evaluate and implement measures to give Lexington a parkway feel <br />c,d,h,g,1, <br />15 <br />9 <br />Lexington Ave <br />Ave north through the City connecting to Shoreview's pathway system <br />throughout the city. <br />m <br />y <br />n <br />n <br />Develop an on -road and off -road pathway from County Road C to County <br />16 <br />8 <br />Victoria (north of C) <br />Road D <br />keep <br />d <br />y <br />n <br />n <br />Develop and on -road and off -road pathway from County Road B to County <br />17 <br />5 <br />Victoria (C to B) <br />Road C <br />keep <br />g <br />y <br />n <br />n <br />Victoria Street (south of <br />Develop and on -road and off -road pathway from Larpenteur Ave to County <br />18 <br />7 <br />B) <br />Road B <br />y <br />The construction of an off - street trail from S. Owasso Blvd to County Road <br />19 <br />29 <br />Dale Street North <br />C. <br />y <br />The construction of an off - street trail from Reservoir Woods Park to <br />20 <br />15 <br />Dale Street South <br />Larpenteur Ave. <br />keep <br />m,n <br />n <br />n <br />n <br />Develop an on -road and off -road pathway from Larpenteur to the north City <br />21 <br />1 <br />Rice Street <br />boundary. <br />keep <br />e,f,n <br />n <br />n <br />n <br />