Laserfiche WebLink
Overlap <br />between <br />Programmed <br />Parks and <br />for street <br />PubWorks <br />reconstruction <br />Master <br />Proposed revised description to consolidate Parks and PWET plans or for <br />Park <br />master <br />in next 5 <br />Plan # <br />Priority # <br />Project Name <br />Original Description <br />other updates <br />Matrixes <br />plans? <br />Completed? <br />years? <br />Brenner to Langton <br />Develop a pathway connection between Brenner Ave and Langton Lake <br />22 <br />32 <br />Connection <br />Park. <br />y <br />n <br />Develop a pathway that goes all around Langton Lake and provide 3 <br />23 <br />31 <br />Langton Lake Loop <br />Develop a pathway that goes around all of Langton Lake <br />east/west connections to Oasis Park along minor streets <br />b <br />y <br />n <br />n <br />Develop pathway facilities, both on and off road, as a part of public street <br />Twin Lakes <br />infrastructure project within Twin Lakes Redevelopment area (between <br />Redevelopment Area <br />Fairview and Cleveland). Provide connection from the redevelopment area <br />24 <br />33 <br />Connections <br />into Langton Lake Park. <br />keep <br />b <br />n <br />n <br />n <br />Develop a trail connection between Cleveland Ave and Walnut Street along <br />County Road C or along the Railroad right of way south of County Road C. <br />Ne Diagonal RR <br />Develop a trail connection between Cleveland Ave and Walnut Street along <br />Also implement Parkway characteristics along County Road C within the <br />25 <br />14 <br />Connection <br />County Road C or along the Railroad right of way south of County Road C. <br />Vicinity of this corridor <br />o <br />y <br />n <br />n <br />Rosedale to Har Mar <br />A light traffic overhead bridge structure across Highway 36 and pathway <br />26 <br />12 <br />Connection <br />connection between Rosedale and Har Mar Mall. <br />keep <br />i,h <br />n <br />n <br />n <br />Develop a pathway connectio between S. Owasso Blvd and County Road C <br />27 <br />28 <br />Heinel Drive Connection <br />along Heinel Drive. <br />keep <br />e <br />n <br />n <br />n <br />Develop a circular pathway system connecting Owasso Hills, Ladyslipper, <br />Judith to Iona <br />Mapleview Park, and Woodhill park, including a segment connecting Judith <br />28 <br />30 <br />Connection <br />Develop a pathway connection between Judith Ave and Iona Lane. <br />and Iona lane along the Mackubin corridor. <br />e <br />y <br />n <br />n <br />Develop a pathway connection between Lovell Ave and Minnesota Street <br />Lovell to Minnesota <br />following Minnesota Ave to Rice Street. Also provide connections to <br />29 <br />27 <br />Connection <br />Develop a pathway connection between Lovell Ave and Minnesota Street. <br />Materion Park and Concordia Park. <br />f <br />y <br />n <br />n <br />Develop a pathway connection from Shryer Ave and from Ryan Ave into <br />30 <br />24 <br />Villa Park Connections <br />Villa Park. <br />keep <br />n <br />n <br />n <br />n <br />Develop a pathway connection that creates a link between the corner of <br />Millwood to County <br />Millwood and Cathsworth through the Ramsey County open space to <br />31 <br />18 <br />Road C2 Link <br />County Road C2. <br />keep <br />d <br />n <br />n <br />n <br />Eustis to St. Croix <br />32 <br />34 <br />Connection <br />Develop a pathway connection Eustis Street and St. Croix Street. <br />keep <br />j <br />n <br />n <br />n <br />Develop a pathway connection between Cohansey Street and HANC. Also <br />Cohansey St to HANC <br />develop new east/west connection from Cohansey to Western between C <br />33 <br />23 <br />Connection <br />Develop a pathway connection between Cohansey Street and HANC. <br />and B2. <br />f <br />y <br />n <br />n <br />Develop a pathway connection along Alta Vista Drive between Larpenteur <br />34 <br />19 <br />Alta Vista Drive <br />Ave and Reservoir Woods Park <br />keep <br />m <br />n <br />n <br />n <br />Identify opportunities to create parkway feel to County Road C and create <br />a, o, b,i,c, <br />Parks <br />County Road C Parkway <br />- <br />layout and implementation plan. <br />h,d,g,e,f <br />y <br />Trails near Evergreen <br />Develop 2 north /south trails along Prior and Midlothian streets from <br />Parks <br />Park <br />Roselawn to County Road B <br />k <br />n <br />Develop a north /south trail along the Pascal right of way from County Road <br />Pascal and Ryan <br />B to Ryan Ave. Develop an east /west trail on Ryan Ave which connects <br />Parks <br />Connection <br />Pascal to Hamline <br />I <br />n <br />Lexington, Mayflower, <br />Develop a trail on Ryan and Fernwood to connect Bruce Russel Park to <br />and Bruce Russel <br />Keller Mayflower Park. Develop another trail on Eldridge to connect Keller <br />Parks <br />connections <br />Mayflower Park to Lexington Park <br />I <br />n <br />Loop trail just west of <br />Create a loop trail system just west of the Roselawn cemetary utilizing <br />Parks <br />Roselawn Cemetary <br />victoria, Larpenteur, Chatsworth, Roma, Oxford, Roselawn and Victoria. <br />m <br />n <br />