My WebLink
|
Help
|
About
|
Sign Out
Home
2013-04-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2013
>
2013-04-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 3:21:57 PM
Creation date
4/18/2013 3:17:41 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/23/2013
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 �ow — <br />YOUR NEIGHBORHOOD <br />OUR COMMUNITY <br />Attachment B <br />B -2 Sidewalk <br />Implementation Planning Session One <br />28 February 2013 <br />Meeting input <br />Following an overview of the Parks and Recreation Renewal Program and its application to <br />Victoria and B -2 Sidewalks, participants were asked Identify issues and share ideas about the <br />proposed sidewalk addition. Responses are included in this summary. <br />As a large group, participants were asked to share theirthoughts about issues that needed <br />to be resolved. Responses included: <br />• Liability for use of the sidewalk. <br />• Property & right -of -way questions. <br />• Speed of traffic resulting from changes. <br />• Fencing along properties. <br />• Corridor is not well lit. <br />• Will other neighborhoods also be going through this process? <br />• Concern for people walking with strollers. <br />• People on B -2 "really move" kids need to be instructed about how to walk /bike — or <br />get them off the road. <br />• Traffic speed on Victoria. <br />• Grotto & B -2 painted crosswalk to get to park. (turned down by county last time <br />requested) <br />• New residents moved in since the last time street was reconstructed. <br />• Need to keep kids safe and out of the street. As they go /walk to schools & parks. <br />• Get tough with the county. <br />• Why not west of Lexington? (Already a trail there). <br />• Trash generated along the route. <br />• Why six feet wide? Why not 4'or 5'? <br />• Bike rules on sidewalks? (No limits in Roseville). <br />• Safety for kids going to school? Extensions for roller bladders, etc.. <br />• Concerns for sidewalks that slope too much. <br />• Can't walk B -2 in the winter. <br />• Lack of curbs along corridor, safety. <br />• Snow clearing. <br />• Catch basins with curbs to get water to. <br />
The URL can be used to link to this page
Your browser does not support the video tag.