Laserfiche WebLink
B -2 Sidewalk <br />Implementation Planning Session One <br />26 February 2013 <br />Page 2 <br />• Cleaning of catch basins. <br />• Localized drainage issues — drains to road. <br />• Removal of trees & front yard space — what is the trade off for the sidewalk? <br />• Maintenance of utilities. <br />• Overhead utilities relocated to below ground. <br />• Loss of driveway space due to boulevard. <br />• Who will maintain the sidewalk? <br />• Sidewalk extensions & connections at Victoria to County Road C. <br />• Conflicts with culverts under existing driveways. <br />