Laserfiche WebLink
arbitration panel. The arbitration panel shall meet and decide said <br />question within 60 days following agreement by the arbitrators to <br />serve on the panel. The arbitration panel shall operate in accordance <br />with the Rules of the American Arbitration Association to the extent <br />consistent with this section and judgment upon the award by the <br />Arbitrator(s) may be entered in any court with jurisdiction thereof. <br />Meanwhile, collection of said recyclable material shall continue <br />pending outcome of arbitration. <br />7.03. Estimating Materials Composition as Collected <br />The Contractor shall conduct at least one materials composition <br />analysis of the City’s recyclables each year to estimate the relative <br />amount by weight of each recyclable commodity by grade. The <br />results of this analysis shall include: (1) percent by weight of each <br />recyclable commodity by grade as collected from the City; (2) <br />relative change compared to the previous year’s composition; and (3) <br />a description of the methodology used to calculate the composition, <br />including number of samples, dates weighed, and City route(s) used <br />for sampling. The Contractor shall provide the City with a copy of <br />each analysis. The analysis will be conducted no later than March 31 <br />of each year and a copy of the analysis provided to the City no later <br />than April 30 of each year. <br />7.04. Estimating Process Residuals <br />The Contractor shall provide the City a written description of the <br />means to estimate process residuals, as defined in 4.36, derived from <br />the City’s recyclables. This written description shall be reviewed and <br />approved in writing by the City. This written description shall be <br />updated by the Contractor immediately after any significant changes <br />to the processing facilities used by the Contractor. <br />7.05. Performance Monitoring <br />The City will monitor the performance of the Contractor against <br />goals and performance standards required within this RFP and in the <br />contract. Substandard performance as determined by the City will <br />constitute non-compliance. If action to correct such substandard <br />performance is not taken by the Contractor within 60 days after being <br />notified by the City, the City will initiate the contract termination <br />procedures. <br />30 <br /> <br />