My WebLink
|
Help
|
About
|
Sign Out
Home
pf07-010
Roseville
>
Planning Files
>
2007
>
pf07-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2014 3:01:54 PM
Creation date
6/14/2013 1:53:50 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
07-010
Planning Files - Type
Interim Use Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
--. <br />6.0 STAFF RECOMMENDATION: <br />--• <br />6.1 The Planning Division recommends APPROVAL of the INTERIM USE PERMIT <br />subject to the following conditions: <br />a. The IUP shall be limited to the temporary storage of contractor equipment, job <br />materials (including manhole sections, trench boxes, manhole rings), sand and <br />cement (covered) and up to 4,000 cubic yards of granular material. <br />b. The subject site shall be limited to 200 feet by 200 feet (1 acre) in size. A 50 foot <br />wide construction access must be installed as a temporary entry to <br />eliminate/reduce wheel tracking of mud/dirt to a minimum. <br />c. The subject area must be fenced (minimum height of 6 feet) and include a <br />lockable gated entry. <br />d. Nadeau Excavating must install silt fencing around the periphery of the 1 acre site <br />as a"best management practice" (to be approved by the City Engineer) to control <br />potential stockpile erosion in the event of rain. <br />e. Street sweeping shall be used as necessary or as required by the Public Works or <br />Community Development Department (per the City Street Cleaning Policy — <br />attached) to minimize the affects of mud/dirt on adjacent roadway surfaces. <br />f. Truck hauling of material must use the southern access to Cleveland Avenue. <br />g. The Interim Use Permit shall be allowed for a period of 10 months (May 2007 to <br />December 2007) unless otherwise requested by Nadeau Excavation three months <br />prior to the expiration date (September 7, 2007). <br />7.0 SUGGESTED PLANNING COMMISSION ACTION: <br />7.1 BY MOTION recommend APPROVAL of the INTERIM U5E PERNIIT for Nadeau <br />Excavating for a 1 acre area in the southeast corner of 2814 Cleveland Avenue (Dorso <br />parcel) based on the comments of Section 5 and the conditions of Section 6 of the project <br />report dated March 7, 2007. <br />Prepared by: Thomas Paschke 651-792-7074 <br />Attachments: Narrative, property location map, and aerial photo of parcel. <br />PF07-010_RPCA_030707.doc\ Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.