My WebLink
|
Help
|
About
|
Sign Out
Home
pf07-002
Roseville
>
Planning Files
>
2007
>
pf07-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2014 2:13:20 PM
Creation date
6/14/2013 2:00:32 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
07-002
Planning Files - Type
Planned Unit Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1050
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
prior to project construction and will be in accordance with the respective City <br />ordinance requirements. <br />4. Comment: Many of the choices that influence water quality are made locally <br />through land use policies and decisions. The development plans are taking <br />policies and decisions out of this local oversight. Do measures need to be <br />implemented to reduce the impact of development? <br />Response: The development plans were submitted according to local ordinance <br />requiremenfs and do not alter local oversight authority. As explained in the <br />EAW, many measures are being implemented fo reduce the impact of proposed <br />development. Proposed traffic mitigation measures are outlined in the response <br />to EAW Questron 21. The EAW states "To improve operating conditions under <br />Year 2018 Cumulative Conditions (i.e., Campus Master Plan full buildout case) <br />the following mitigation measures are suggested: 1) Implementing a traffic signal <br />at Fairview Avenue/Lydia Avenue with.`an exclusive soufhbound left turn lane of <br />250 feet; 2) Directing outbound right;turns and inbound left turns to and from the <br />west via fhe Northwestem College west gate during the p.m. peak hour, 3) <br />Adding an exclusive 150-foof right turn;lane atlydia/College entrance to <br />facilitate safe maneuvers for college=bound, vehicles; 4)Adding appropriate <br />berming on the south side of the intersecfion of Lydia/College to accommodate <br />inbound left turns from the west and to mitigafe pofential impacts from car <br />headlights to residential properties to the south;' S) One additional exclusive <br />eastbound {eft tu►�7 lar►e at Snel{ing Avenue%ydia Ave�fue w;th left iurn lanes <br />extended to 200 feet (the College will dedicafe the right-of-way required on <br />either side of Lydia Avenue to accommodate the new lanes); 6)One additional <br />exclusive eastbound left turn lane at Snelling Avenue/County Road G2 with left <br />tum�lanes'extended to 200 feet. 7) Developing a Travel Demand Management <br />P/an' (TDM) for carripus studenfs, staff, and employees. " <br />C .r�.v � <br />Stormwater Management„Practrces are outlined in the SWMP attached to the <br />�'��:x; f� <br />EAW, however,;,,the Plan presents a campus-wide Stormwater Managemenf <br />strategy that identifies Best Management Pracfices that can be implemented to <br />facilitate the campus:redevelopment and mitigate for potential development <br />impacts. The overal! goal is to cooperate with appropriate agencies including the <br />Cities of Roseville ancl;Arden Hil/s, Rice Creek Watershed District and the <br />Minnesota Pollution Contro/ Agency to improve the quality of both of the campus <br />/akes. Achievement of these goals will deliver good quality stormwater runoff <br />from the campus to /akes and wetlands at acceptable rates and volumes, while <br />reducing pollutant and sediment loadings and stream bed/stream bank erosion <br />and water quality degradation. Stormwater quality and quantity Best <br />Management Practices (BMPs) that seem particularly appropriate for the <br />campus include: wet detention ponds; pollution prevention such as materia! <br />storage control, turf management, parking lot cleaning; pervious pavements to <br />reduce the amount of runoff,� infiltrafion practices and filter devices which <br />primarily trap solids that have pollutants attached to them. <br />With these and other mitigation measures in place, the project has no potential <br />for significant environmental effects. Storm wafer management practices for the <br />proposed capital improvements will be designed and constructed in a manner <br />meeting federal, state, and local permitfing requirements, for water qualify and <br />quantity control, at the time the improvements are constructed. <br />TKDA Project No. 13529.002 Page 3 Dra(t Date: July 9, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.