My WebLink
|
Help
|
About
|
Sign Out
Home
pf07-006
Roseville
>
Planning Files
>
2007
>
pf07-006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 4:07:07 PM
Creation date
6/14/2013 2:28:08 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
07-006
Planning Files - Type
Planned Unit Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />Final Grading Plans. The final Phase I and Phase II grading plans must be reviewed and <br />approved by the Director of Public Works before any permits will be issued for the <br />respective phases. All grading shall comply with the approved grading plans and shall be <br />the responsibility of the DEVELOPER. The DEVELOPER'S engineer shall provide to <br />the CITY a letter certifying that the grading project was constructed and was completed <br />as depicted in the approved grading plans prior to the issuance of Certificate(s) of <br />Occupancy. <br />Final Utility Servicing Plan. The final utility servicing plan for the full build-out of the <br />Subject Property must be reviewed and approved by the Director of Public Works prior to <br />any permits being issued for the Phase I building. <br />Erosion Control. Prior to Phase I and Phase II site grading, and before any utility <br />construction is commenced or building permits are issued, an erosion control plan must <br />be submitted for approval by the Director of Public Works and/or the Rice Creek <br />Watershed, and all erosion control actions shall be implemented, inspected and approved <br />by the CITY. <br />Clean Up. The DEVELOPER shall clean dirt and debris from public streets that has <br />resulted from Phase I and Phase II construction work by said DEVELOPER or <br />DEVELOPER'S contractors, its agents or assigns. The CITY will determine whether it is <br />necessary to take additional measures to clean dirt and debris from the streets. After 24 <br />hours verbal notice to the DEVELOPER, the CITY may complete or contract to complete <br />the clean up at the DEVELOPER'S expense. <br />Utility & Drainage Easements. The DEVELOPER is responsible for creating, <br />dedicating and/or granting specific easements pertaining to public utility services in <br />anticipation of the full build out of the Subject Property, as approved by the CITY and/or <br />storm water ponding and treatment as approved by Rice Creek Watershed District. <br />9. SPECIFIC PUD STANDARDS/CONDITIONS OF APPROVAL <br />Use — Permitted: This Lot shall be restricted to a multiple family residential use not <br />exceeding 95 units subject to the following qualifications: <br />A. A 4-story, age-restrictive, senior cooperative residence of up to 95 dwelling units <br />is hereby approved by the terms of this AGREEMENT. This redevelopment shall <br />generally be restricted to the dimensions and location/type of improvements <br />specified in plans identified in Section 4 of this AGREEMENT, and supporting <br />documents submitted by the DEVELOPER. Where not inconsistent with this <br />AGREEMENT, the standards of the underlying R-3 (General Residence) zoning <br />district shall apply, as stated in Chapter 1004 of the Roseville City Code. <br />B. Building and Parking Lot Setbacks: The site plans (Exhibits C.1 and C.2) <br />illustrating the proposed structure, parking lot, property lines, and setbacks shall <br />represent the PUD zoning district standards. Where these requirements are silent, <br />the zoning requirements and the standards of the underlying zoning district shall <br />govern. <br />C. Building Height & Building Material: The senior cooperative shall have a roof <br />height not exceeding 60 feet and include a residential truss roof complete with <br />
The URL can be used to link to this page
Your browser does not support the video tag.