My WebLink
|
Help
|
About
|
Sign Out
Home
pf07-006
Roseville
>
Planning Files
>
2007
>
pf07-006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 4:07:07 PM
Creation date
6/14/2013 2:28:08 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
07-006
Planning Files - Type
Planned Unit Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />`s�:'�����L;�; �`t��':�aa���� ��� � €��::`;, <br />Recreation staff and '��ature CeFZier staff were present to update Coirunission Members on �lans tor sprin;i a!=ci <br />surnmer programming. Rick Schultz, recreation superintendeni, Ro�ann 1��laxey, recreation supervisor, Eric <br />Roettcher, recreation supervisor and Debbie Cash, naturalist presented the commission with a preview to <br />programs; events and opportunities planned for the coming summer. The vast array of recreatian happeninas <br />ior people of all a�es de�r�nstrated our mc�tto ... Roseville Parks and Recreatio�l offers "Something for <br />Evervone" <br />ROSEVILLE SKATING CENTER PROJECT UPDATE <br />Staff provided a most up to date report on the Skating Center project. Bid deadline was today, March 6. Eleven <br />bids were received. The low bid came in at $533,000 for the base project (this project price does not include <br />architecture fees and project contingency). There were several alternates for the project, the main o�les being <br />the basement (under new addition), upgraded roof structure and roofing materials and the restroom <br />additions/upgrades. Staff to more completely review bid proposals and take recommendations and requests to <br />the council as soon as possihle in effort to adhere to project timelines for coinpletion. <br />DIRECTORS REPORT <br />o Recent Snow Removal Efforts <br />■ Parks and Recreation staff is responsible for path���ay clearing. E'arks and Recreation <br />maintenance operations currently have 2 pathway machines, fate would have it that both <br />machines went do�m during the most recent storm challenging staff to keep up with the s�low <br />removal on the pathways. Staff did a great job in all their efforts. <br />o Arena Geothermal RFPs to go out soon. <br />o Parks and Recreation Commission Applicant interviews are scheduled for I�londay, March 12. 4 <br />applications have been received for the one position. <br />o Deadline for the HANC Planning Committee apptications are due March 14 <br />o Discussion bv cotmcil and steering committee on the Imagine Roseville 2025 outcomes are scheduled <br />for March �9. <br />O'f l�li <br />o Tonight is Richard "Jake" Jacobson's final Commission meeting. Staff and Cornmissioners echoed <br />appreciation and respect for Jake's leadership and insight while serving on the Parks and Recreation <br />Cammission. <br />o Brodt-Lenz: <br />■ Recruiting �roluiiteers f�r ARTS@theOVAL, March 24 & 2� at the Skating Center <br />4. Meeting acljourned at 9:40 pm <br />Respectfully Submitted, <br />Jill Anfang, Assistant Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.