My WebLink
|
Help
|
About
|
Sign Out
Home
pf07-060
Roseville
>
Planning Files
>
2007
>
pf07-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 10:57:20 AM
Creation date
6/17/2013 3:03:40 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
07-060
Planning Files - Type
Variance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />PLANNING COMMISSION MINUTES <br />MAY 4, 1983 <br />- 3- <br />following conditions: <br />�--. <br />1) That a public water main be constructed running through the southerly portion <br />of the Peck property from Alta Vista to Dale, and north on Dale to serve <br />properties on Dale. <br />2) That an easement for water and sanitaxy sewer be provided throuqh the southerly <br />portion of the Peck property. <br />3) That the driveway for the home on the easterly lot be designed to a11ow access <br />to Dale Street in a forward direction. <br />Roll Call, Ayes: Berry, Wiski, Dressler, Johnson, Matson, Moeller, and Rukavina. <br />Nays: None. <br />PLANNING FILE 1426 - Roberts Construction request for division of lot and special <br />use permit for PUD at 2805 Fairview. <br />PRESENTATION <br />Mr. Dahlgren indicated Roberts Construction proposes to amend a Planned Unit <br />Development in order to divide a lot currently occupied by two office buildings <br />and a warehouse. The northerly portion of the lot is zoned limited business, and <br />contains two office buildings. The southerly portion is zoned Industrial, and is <br />occupied by a warehouse. Roberts Construction proposes to divide the land into <br />two parcels, separating the office structures from the warehouse. As there is only <br />one driveway serving the existing parcel, a permanent driveway easement would <br />be needed for the common access are a. Also, water and sanitary sewer easements <br />need to be provided from the northerly piece through which services can be <br />extended to the southerly parcel. Mr. Dahlgren indicated there is no problem <br />with the division as long as appropriate documents are p repared and recorded <br />acc�mmodating the common access conditions, providing for utility easements, <br />and providing for joint maintenance of the common access area. <br />RECOMMENDATION <br />Matson Moved and Berry Seconded th at the Planning Commission recommend approval <br />of Roberts Construction's request for division of lot and special use permit for <br />PUD at 2805 Fairview, with the condition that the app ropriate easement and <br />maintenance documents be p repared, and that they be reviewed by City Engineering <br />and Legal staff. <br />Roll Call, Ayes: Berry, Wiski, Dressler, Johnson, Matson, Moeller, and Rukavina. <br />Nays: None. <br />
The URL can be used to link to this page
Your browser does not support the video tag.